Laserfiche WebLink
• URS, 2009. Eclipse Mill Road Pipeline Protection Project, Volume 2 of 2, Calculation Package, <br /> dated May 2009. Prepared for the City. URS Project No. 33758986 <br /> • Earth Solutions Northwest(ESNW), 2013. Geotechnical Evaluation;Eclipse Neighborhood; <br /> 3300 to 3600 Chestnut Street;Everett, Washington, dated May 2, 2013. Report No. ES- <br /> 2598.04 <br /> • ESNW, 2015. Boring logs for B-101 through B-103, dated January 2015, and Test Pit logs for <br /> TP-1 through TP-6, dated April 201 5. <br /> We prepared a draft Summary of Settlement and Surcharge Analysis letter' for the project dated <br /> June 12, 2015 that provided a summary of our settlement and surcharge analysis. GEI peer <br /> reviewed our report and provided their review comments in a report dated July 28, 2015. We <br /> have provided their original comments below, as well as our responses. <br /> REVIEW COMMENT 1 <br /> The GeoDesign report does not identify the borings and test pits from previous reports that they <br /> are relying upon in their design. These explorations should be shown on a site plan, discussed <br /> in the report, and copies of the exploration logs should be included in the report appendices. <br /> We assume that they are referring to the ESNW explorations summarized above. <br /> RESPONSE TO REVIEW COMMENT 1 <br /> The borings and test pits we used in our evaluations are shown on the site plan on Figure 1. <br /> Copies of the boring and test pit logs are presented in the Attachment of this letter. Our <br /> comprehensive geotechnical report for the project will discuss the findings from these <br /> explorations. <br /> REVIEW COMMENT 2 <br /> GeoDesign should review the URS reports and include the subsurface information and settlement <br /> evaluations in their report, specifically with respect to how the planned site development could <br /> impact the existing utilities. <br /> RESPONSE TO REVIEW COMMENT 2 <br /> After issuing our draft Summary of Settlement and Surcharge Analysis letter,we were provided a <br /> copy of the URS report that primarily focuses on the City utility pipelines that cross the site. We <br /> have reviewed the URS report and will include information from the report in the comprehensive <br /> geotechnical report that we prepare for this project. Since the URS report already discusses the <br /> impacts of future development on the City pipelines, we will not duplicate their work in our <br /> report. It is our understanding that the City is responsible for maintaining their utility pipelines <br /> that cross the site and that they considered the recommendations in the URS report before they <br /> reviewed and approved the project grading plans. <br /> ' GeoDesign,Inc.,201 5. Draft Summary of Settlement and Surcharge Analysis;Everett Riverfront Eclipse Site;Everett, <br /> Washington,dated June 12,2015. <br /> G EO DESIGN= 2 Polygon-128-01:0811 15 <br />