My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tadpole Cartesia Inc dba TC Technology 1/2/2008
>
Contracts
>
Agreement
>
Technology
>
Tadpole Cartesia Inc dba TC Technology 1/2/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 10:22:05 AM
Creation date
5/28/2021 10:21:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tadpole Cartesia Inc dba TC Technology
Approval Date
1/2/2008
Council Approval Date
12/24/2007
Department
Purchasing
Department Project Manager
Clark Langstraat
Subject / Project Title
Purchase Install & Training of Mobile ArcGIS
Tracking Number
0002931
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Technology
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1 <br /> Project Steps <br /> The initial project task is the Project Kick-off Meeting that will serve to identify the project teams and establish <br /> normal means of communication between organizations. In addition, this time will be used to define what required <br /> functionality from existing map applications will be included in the standard implementation work scope, as well as <br /> will serve as a forum to address other project initiation steps and define the baseline project schedule. The meeting <br /> will be held at the City of Everett's headquarters and followed by a series of teleconference calls used to coordinate <br /> further specification details, and resolve any outstanding design issues. These efforts will culminate in an agreed <br /> Design Specification. <br /> 1. Project Initiation <br /> • Form teams and begin planning <br /> • Detail business processes <br /> • Define user and system requirements <br /> • Develop scope and project plan <br /> • Agree Design specification <br /> • Agree on Design specification <br /> Acceptance of the Design Specification will trigger a number of implementation steps including any minor <br /> customization work consistent with the configuration of GO! Sync Mobile GIS. <br /> Deliverables <br /> • One 8 hour onsite meeting at City of Everett Service Center <br /> • Three 2 hour teleconference calls with City Staff <br /> • Documented summary of requirements and project plan <br /> 2. Customizations/Configurations <br /> • Initiate implementation design <br /> • Customize and configure <br /> • Perform unit testing <br /> Upon conclusion of this phase of the project plan, work will commence on the Standard Installation,which <br /> includes installation of the basic system onLsite and a demonstration of baseline operations to City staff. Site <br /> Acceptance Testing will be performed to test that the completed application meets specifications and to verify that <br /> the application meets acceptable performance levels. Both users and administrators will be trained during this <br /> period. <br /> Deliverables <br /> • 6 days of professional services to customize and configure application <br /> • Onsite demonstration to City Staff <br /> • The source code for all customizations provided to meet functionality requirements of the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.