Laserfiche WebLink
Fig. 1: Examples of How Far You Could Go at Midday in 15, 30, 45, or 60 Minutes <br /> 2015 2040 <br /> 15 - --30 <br /> - <br /> w <br /> gpxr <br /> il j ✓4 <br /> t <br /> Er <br /> ti <br /> . 1., <br /> DOWNTOWN BALLARD <br /> Source: King County Metro CONNECTS (2016) <br /> Task 3.1 -Everett Transit Long Range Plan <br /> A significant level of effort has already been invested in understanding the dimensions of implementing <br /> the "Growth Network" outlined in the Long-Range Plan. However, there are topics that have arisen <br /> since plan adoption that need to be further investigated and understood.These include the need to <br /> update forecasts of capital and operating cost of incremental growth through 2040 in annual <br /> increments, 2020-2040. This will allow consideration of what the fixed route network might look like <br /> when light rail reaches Everett, presently planned for the last time period (Sound Transit is presently <br /> projecting 2036). Some of the detailed issues include: <br /> 1) Capital—defined annually <br /> a) Funding alternatives—What grant funding alternatives and opportunities are realistic and <br /> what might be the magnitude and timing of those? <br /> b) Revisit needs and capacity of a re-constructed, annex, or new Maintenance and Operations <br /> Base <br /> c) Administrative space needs <br /> d) Fleet replacement and expansion including updated assessment of electric bus options <br /> e) Financial participation in Swift Blue line and potential Red line <br /> 2) Operating—defined by the planning milestones, 2024 and 2036. <br /> a) Staffing assumptions for operators, supervisors, mechanics,support staff <br /> b) Hours, miles, and fleet estimates for each five year period <br /> c) Energy costs—assuming transition to 100%electric <br /> d) Operating cost participation in Swift lines and paratransit "Green Zone" <br /> e) Network changes to adapt to Link extension into Snohomish County and Stride (Sound <br /> Transit's freeway-based Bus Rapid Transit or BRT) implementation on SR-522 and 1-405 <br /> f) Confirmation of ADA Paratransit operating plan <br /> Page 11 of 17 <br />