Laserfiche WebLink
COUGHLINPORTERLUNDEEN <br />STRUCTURAL CIVIL SEISMIC ENGINEERING <br />June 27, 2019 CPL Job # S170030-03 <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 <br />RE North Middle School Modernization — Area A and B, Permit # 81711-003 <br />Structural Observation Completion <br />To whom it may concern: <br />The purpose of this letter is to acknowledge that Structural Observation in accordance with IBC Section 1704.6 <br />has been completed for Areas A and B at the North Middle School Modernization Project. Any observed <br />deficiencies were brought to the attention of the contractor and special inspector and noted in site visit reports <br />and/or project minutes of meeting. <br />To the best of our knowledge, the project has been constructed in accordance with the Contract Documents. <br />Sincerely, <br />COUGHLIN PORTER LUNDEEN, INC. <br />David Aguilera, PE <br />Structural Project Engineer <br />841 SECOND AVENUE, SUITE 900 SEATTLE, WA 98104 / P 206.343.0460 <br />4 <br />V / // <br />