My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 3. Measure by length: <br /> a. Measurement by length will be the number of linear feet of completed <br /> installation measured along the centerline of pipe through fittings, valves and <br /> coupling. I <br /> b. Limits of measurement shall be from the centerline of couplings, valves, fitting, <br /> and manholes. I <br /> 4. Measurement by volume: <br /> a. Measure volume by measuring the average-end-area method. All or some <br /> computations may be based upon excavation measurements and other data <br /> measured at the point of loading, for excavated material, or delivery, for <br /> imported material. <br /> b. Hauling vehicles may be of any size or type provided that the body is of such <br /> shape that the actual contents and volumes may be readily and accurately <br /> determined. <br /> c. If the Owner's Representative requires, the Contractor shall level loads to I <br /> facilitate measurement. <br /> E. Payment I <br /> 1. Unit Price payment will be made at the Unit Price indicated on the Bid form for the <br /> quantity of each item measured and incorporated into the Work. Payment will be <br /> the Unit Price multiplied by the measured quantity. <br /> 2. Lump Sum payment will be paid at the price indicated on the Bid Form using the I <br /> methods specified herein. <br /> 3. All other work required to complete the Work specified in the Contract Documents, r <br /> but not indicated specifically as a pay item, shall be considered necessary and <br /> incidental work. <br /> 1.2 SCHEDULE OF LUMP SUM AND UNIT PRICES <br /> 1. Mobilization, Bonds, Demobilization I <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute complete compensation for all preconstruction <br /> costs of preparatory work and operations performed by the contractor including <br /> all work required to provide temporary facilities, temporary utilities, security , <br /> fencing and security as required to protect material and equipment remaining on <br /> I <br /> Replacement of Reservoir 2 Measurement and Payment <br /> WO# UP3658 01 22 00- 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.