Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> site during the project construction, material storage areas, stock pile areas, and <br /> other temporary improvements as required to complete the project work. Also <br /> included is the costs for bonds, insurance, permits, demobilization and removal of <br /> all temporary improvements upon completion of the project. <br /> The amounts paid for mobilization in the contract progress payment will be based <br /> on the percent of the original contract amount that is earned from other contract <br /> items, as follows: <br /> a. When 5% is earned, either 50% of the amount for mobilization or 5% of the <br /> original contract amount, whichever is the least, will be paid; <br /> b. When 10% is earned, either 100% of the amount for mobilization or 10%of the <br /> original contract amount, whichever is the least, will be paid; <br /> c. When all work is completed, amount of mobilization exceeding 10% of the <br /> original contract amount will be paid. <br /> This schedule of mobilization progress payments will not limit or preclude progress <br /> payments otherwise provided by the contract. <br /> 2. Surveying and Construction Staking <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for all material, labor and <br /> equipment for the setting and monitoring the location, elevation, alignment <br /> and grade of the work, including establishing and staking of the proposed <br /> facilities, utility improvements and other easement lines, public right of way lines, <br /> and existing and new fences, as required, to complete the work. This includes all <br /> work necessary to provide construction survey, control monuments, temporary <br /> benchmarks, staking of facilities, roadways, walls, boundaries, and other related <br /> surveying/staking necessary for construction per Details and Specifications. <br /> 3. Trench and Excavation Safety Systems <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for all material, labor and <br /> equipment, complete and in place, for work necessary to protect all excavations. <br /> The installation of shoring and trench safety systems includes, but is not limited to, <br /> shoring, benching, bracing, excavating, sheeting and trench boxes, and contractor <br /> designed excavation support systems as required by these Contract Documents <br /> and pertinent laws and regulations. <br /> Replacement of Reservoir 2 Measurement and Payment <br /> WO# UP3658 01 22 00- 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.