My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(company) <br /> hereby certifies that the Contract Claim for extra compensation and extension of <br /> Contract Time, if any, made herein for Work on this Contract is a true and <br /> complete statement of the factual basis of the Contract Claim and all actual costs <br /> incurred and time sought, and is fully documented and supported under the <br /> Contract between the parties. <br /> Date /s/ <br /> Subscribed and sworn before me this day of <br /> Notary Public <br /> My Commission Expires: <br /> 12.3 False Or Omitted Information <br /> A. General <br /> 1. The Contractor waives each Contract Claim for which it presents material information <br /> that it knows, or in the exercise of reasonable care should know, is false, or omits or fails <br /> to disclose material information relating to such Contract Claim. In such case, Contractor <br /> shall reimburse the Owner for any and all fees and expenses incurred in investigating any <br /> such Contract Claim. <br /> 12.4 Remedies <br /> A. General <br /> 1. If a Contract Claim has merit in whole or in part, then Contractor's sole remedies shall <br /> be those provided in this subsection. <br /> a. Contractor must timely and strictly comply with the requirements of ARTICLE 10. <br /> NOTICE TO OWNER, ARTICLE 11. DIFFERING SITE CONDITIONS, ARTICLE 12. <br /> CONTRACT CLAIMS and all other General Conditions relating to the Contract <br /> Claim. <br /> b. Adjustments to Contract Time shall be determined pursuant to 5.2.C. Extensions <br /> of Contract Time. <br /> 2. Failure to comply strictly and timely shall be deemed a waiver of the Contract Claim. <br /> B. Extra Work <br /> 1. Adjustment of Contract Sum <br /> a. If the Contractor is entitled to an adjustment of Contract Sum because of Extra <br /> Work,the adjustment shall be calculated and paid as provided in 9.5. Adjustment <br /> Of Contract Sum. <br /> 1) This amount includes jobsite and home office Overheads for such Work, <br /> including any schedule delays relating to such Work. <br /> 2) No compensation in addition to that provided in 9.6. Force Account shall <br /> be paid for such things as extended Overhead or other costs or damages. <br /> b. Extension of Contract Time <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.