My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 2.03.2 Materials <br /> Materials shall meet the requirements of the following: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> ' Gravel Borrow 9 03.14(1) Standard Specifications <br /> 2-03.3 Construction Requirements <br /> Supplement 2-03.3 by adding the following: <br /> Blasting is not allowed within the City limits of Everett. <br /> Use suitable excavated material for roadway embankments. Dispose of surplus <br /> excavated material or unsuitable material in accordance with 2-03.3(7). <br /> Engineer will not approve payment for unauthorized excavation or embankment, or <br /> both, beyond the limits indicated on the Plans. Return areas of unauthorized <br /> excavation or embankment, or both, to their original conditions or better at the <br /> Contractor's expense. <br /> Fine grading in fill or backfill areas shall begin within the top six inches of subgrade. <br /> Final grading shall produce a uniform surface within established tolerances and without <br /> ' abrupt changes in grade. <br /> Construction requirements for pavement patching authorized by Engineer outside of <br /> Project limits shall be in accordance with the Section 5-04 and City Standard Drawing <br /> No. 326 for existing asphalt concrete over prepared grade. <br /> Provide temporary drainage to keep the subgrade free from standing water. <br /> Ensure the top six inches of subgrade is free from rocks or cemented lumps larger <br /> ' than 2-1/2 inches in greatest dimension. <br /> Excavate for curbs and gutters by accurately cutting to the cross-sections, grades, and <br /> elevations shown. Take care not to excavate below the specified grades. Maintain all <br /> excavations free from accumulation of detrimental quantities of leaves, brush, sticks, <br /> trash, and other debris. <br /> 2-03.3(2) Rock Cuts <br /> Delete entire section." <br /> 2-03.3(3) Excavation Below Subgrade <br /> Supplement 2-03.3(3) by adding the following: <br /> Proof Rolling: Proof roll subgrade under the roadway with a fully loaded tandem <br /> truck following trench backfilling and grading to subgrade to identify soft or loose <br /> areas in the subgrade. In areas where the subgrade does not stand up to the <br /> proof roll, over excavate the subgrade and replace with imported Foundation <br /> Material Class A or B or Gravel Borrow, as determined by the Engineer, to bring <br /> the subgrade up to the proper compaction and grade. Compact backfill material in <br /> accordance with 2-03.3(3). <br /> 2-03.3(7) Disposal of Surplus Material <br /> 2-03.3(7)C Contractor-Provided Disposal Site <br /> ' Delete the first paragraph of 2-03.3(7)C and substitute the following: <br /> Make arrangements for disposal of surplus and other materials. All costs for <br /> disposal of surplus and other materials shall be included with the respective <br /> Bid items of the Contract with no direct compensation being made. <br /> Dispose of Asbestos-cement pipe in accordance with the requirements of the <br /> State of Washington Department of Ecology and the Snohomish County Solid <br /> Waste Division. <br /> Watermain Replacement"V" Division 2-EARTHWORK April,2021 <br /> WO No.-UP3730 SP-135 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.