Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-03.4 Measurement <br /> Delete all paragraphs under 2-03.4 and substitute the following: I <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Items Descriptions and provided in Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-03.5 Payment <br /> Delete all paragraphs under 2-03.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> There will be no direct compensation made for haul on material moved within or from <br /> the Project site and the Contractor shall include the cost of hauling in his various unit <br /> contract prices. <br /> There will be no direct compensation made for "Proof Rolling" as required in this <br /> section for excavated portions of the roadway and the Contractor shall include costs in <br /> his various unit Contract prices. <br /> Payment for over excavation below subgrade and disposal of over excavated materials <br /> as required in this section shall be included in the Bid item for Foundation Material. <br /> Imported material required in this section shall be paid for by the unit Bid price for that <br /> material. Payment for placement and compaction of import material shall be included <br /> in the unit price per ton of import material. <br /> 2-04 HAUL <br /> 2-04.1 Description <br /> Delete the first paragraph of 2-04.1 and substitute the following: <br /> This Work shall consist of transporting excavated material from its original site to its I <br /> final place on the Project or to a Contractor arranged waste site. <br /> 2-04.3 Vacant <br /> Revise 2-04.3 to read as follows: I <br /> 2-04.3 Construction Requirements <br /> Off-highway earth-moving equipment shall not haul on or across streets, roadways, <br /> driveways, trails, sidewalks or parking lots not being improved in the Contract. <br /> 2-04.4 Measurement <br /> Revise 2-04.4 to read as follows: <br /> 111 <br /> Haul work will not be measured. <br /> 2-04.5 Payment <br /> Revise 2-04.5 to read as follows: ' <br /> All costs for the Work described in Section 2-04 shall be included with excavation work <br /> with no direct compensation made. <br /> 2-07 WATERING , <br /> 2-07.3 Construction Requirements <br /> Supplement 2-07.3 by adding the following: <br /> Only Everett Public Works Department Water Division personnel and the Project <br /> Inspector may authorize the operation of City fire hydrants or making connections to <br /> City water mains. Upon obtaining City permission, the following shall apply: <br /> Watermain Replacement"V" Division 2—EARTHWORK April,2021 <br /> WO No.—UP3730 SP—136 <br />