Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT SPECIAL PROVISIONS <br /> 4-06.3(5) Hauling Equipment <br /> Hauling equipment for asphalt treated base shall conform to the requirements of Section <br /> 5-04.3(2). <br /> 4-06.3(6) Spreading and Finishing <br /> ' Asphalt treated base shall be spread with a spreading machine equipped with a <br /> stationary, vibratory, or oscillating screed or cut-off device, subject to the approval of the <br /> Engineer. Approval of the equipment shall be based on a job demonstration that the <br /> finished product will meet all requirements of the Specifications. Automatic controls will <br /> not be required. Unless otherwise directed by the Engineer, the nominal compacted <br /> depth of any ATB layer shall not exceed 0.40 feet. On areas where irregularities or <br /> unavoidable obstacles make the use of mechanical spreading and finishing equipment <br /> ' impractical, the paving may be done with other equipment or by hand. <br /> The internal temperature of the ATB mixture at the time compaction is achieved shall be <br /> a minimum of 185°F. Rollers shall only be operated in the static mode when the internal <br /> ' temperature of the mix is less than 175°F. <br /> 4-06.3(6)A Subgrade Protection Course <br /> Unless otherwise specified by the Engineer, the Contractor shall place the asphalt <br /> ' treated base as a protection for the prepared Subgrade on all sections of individual <br /> Roadways which are to receive asphalt treated base as soon as 10,000 square <br /> yards of Subgrade is completed. This requirement shall not be limited to contiguous <br /> areas on the project. <br /> The surface of the Subgrade protection layer when constructed on a grading project <br /> shall conform to grade and smoothness requirements that apply to the Subgrade <br /> ' upon which it is placed. <br /> 4-06.3(6)B Finish Course <br /> The final surface course of the asphalt treated base, excluding Shoulders, shall not <br /> deviate at any point more than 3/8 inch from the bottom of a 10-foot straightedge <br /> laid in any direction on the surface on either side of the Roadway crown. Failure to <br /> meet this requirement shall necessitate sufficient surface correction to achieve the <br /> required tolerance, as approved by the Engineer, at no expense to the City. <br /> When portland cement concrete pavement is placed on an asphalt base, the <br /> surface tolerance of the asphalt base shall be such that no elevation lies more than <br /> 0.05 feet below nor 0.00 feet above the plan grade minus the specified plan depth <br /> of portland cement concrete pavement. Prior to placing the portland cement <br /> concrete pavement, any such irregularities shall be brought to the required <br /> tolerance by grinding or other means approved by the Engineer, at no expense to <br /> the City. <br /> 4-06.3(7) Density <br /> The asphalt treated base shall be compacted to a density of not less than 80 percent of <br /> the maximum theoretical density established for the mix by WSDOT FOP for AASHTO <br /> T 209. The density of the base shall be determined by means of tests on cores taken <br /> from the Roadway or with the nuclear gauge in accordance with Section 5-04.3(10)B. <br /> ' The frequency of these tests shall be at the discretion of the Engineer, but in no case <br /> shall it be less than one control lot for each normal day's production. The use of <br /> equipment which results in damage to the materials or produces substandard <br /> workmanship will not be permitted. <br /> ' Water Main Replacement"V" Division 4-BASES April,2021 <br /> WO No-UP3730 SP-143 <br />