My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS I <br /> 4-06.3(8) Anti-Stripping Additive <br /> An anti-stripping additive shall be added to the asphalt binder material in accordance I <br /> with Section 9-02.4 in the amount designated in a WSDOT mix design/anti-strip <br /> evaluation report for a dense graded hot mix asphalt design from the same gravel source <br /> within the last 24 months or as evaluated separately by an accredited lab using current I <br /> WSDOT test methods (AASHTO T324 — Hamburg or WSDOT TM T718 — Modified <br /> Lottman). Alternately, the ATB may be evaluated for anti-strip additive using ASTM <br /> D3625 (Standard Practice for Effect of Water on Bituminous-Coated Aggregate Using <br /> Boiling Water) by an accredited lab. The anti-stripping additive required will be the 111 <br /> minimum amount necessary to achieve a passing evaluation. <br /> 4-06.4 Measurement <br /> Delete all paragraphs in 4-06.4 and substitute the following: I <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B— Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. I <br /> 4-06.5 Payment <br /> Delete all paragraphs in 4-06.5 and substitute the following: I <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B— Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Water Main Replacement"V" Division 4—BASES April,2021 I <br /> WO No—UP3730 SP—144 <br />
The URL can be used to link to this page
Your browser does not support the video tag.