My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> IDIVISION 5 — SURFACE TREATMENTS AND PAVEMENTS <br /> 5-04 HOT MIX ASPHALT <br /> I Delete 5-04 and substitute the following: <br /> 5-04.1 Description <br /> Work shall consist of providing and placing one or more layers of plant-mixed hot mix <br /> I asphalt (HMA) on a prepared foundation or base in accordance with these Specifications <br /> and the lines, grades, thicknesses, and typical cross-sections shown in the Plans. The <br /> manufacture of HMA may include warm mix asphalt (WMA) processes in accordance with <br /> I these Specifications. WMA processes include organic additives, chemical additives, and <br /> foaming. <br /> Provide HMA composed of asphalt binder and mineral materials as may be required, mixed <br /> I in the proportions specified to provide a homogeneous, stable, and workable mixture. <br /> 5-04.2 Materials <br /> Provide materials meeting the requirements of the following sections: <br /> I Asphalt Binder 9-02.1(4) Standard Specifications <br /> Cationic Emulsified Asphalt 9-02.1(6) Standard Specifications <br /> Anti-Stripping Additive 9-02.4 Standard Specifications <br /> I HMA Additive 9-02.5 Standard Specifications <br /> Aggregates 9-03.8 Standard Specifications <br /> Recycled Asphalt Pavement 9-03.8(3)B Standard Specifications <br /> Mineral Filler 9-03.8(5) Standard Specifications <br /> I Recycled Material 9-03.21 Standard Specifications <br /> Portland Cement 9-01 Standard Specifications <br /> Sand 9-03.1(2) Standard Specifications <br /> I (As noted in 5-04.3(5)C for crack sealing) <br /> Joint Sealant 9-04.2 Standard Specifications <br /> Foam Backer Rod 9-04.2(3)A Standard Specifications <br /> IThe Contractor may use up to 20 percent RAP by total weight of HMA with no additional <br /> sampling or testing of the RAP. Sample and test the RAP at a frequency of one sample for <br /> I every 1,000 tons produced and not less than two samples per project. Report the asphalt <br /> content and gradation test data to the City when submitting the mix design for approval on <br /> the QPL. Include the RAP as part of the mix design as defined in these Specifications. <br /> I Provide the grade of asphalt binder as required by the Contract. Blending of asphalt binder <br /> from different sources is not permitted. <br /> The Contractor may only use warm mix asphalt (WMA) processes in the production of HMA <br /> with 20 percent or less RAP by total weight of HMA. Submit to the Engineer for approval <br /> Ithe process that is proposed and how it will be used in the manufacture of HMA. <br /> For production of aggregates comply with the requirements of Section 3-01. <br /> I For preparation of stockpile site, the stockpiling of aggregates, and the removal of <br /> aggregates from stockpiles comply with the requirements of Section 3-02. <br /> 5-04.2(1) How to Get an HMA Mix Design on the QPL <br /> I If the contractor wishes to submit a mix design for inclusion in the Qualified Products <br /> List (QPL), please follow the WSDOT process outlined in Standard Specification 5- <br /> 04.2(1). <br /> IWater Main Replacement"V" Division 5—SURFACE TREATMENTS April,2021 <br /> WO No.—UP3730 AND PAVEMENTS <br /> SP-145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.