My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Cultivate trench restoration in turf areas to 4-inch depth to provide firm yet <br /> ' friable seedbed. Provide topsoil if needed. Cultivate seeding restoration areas <br /> no sooner than one week prior to seeding. <br /> Delete the third paragraph in its entirety. <br /> Supplement 8-01.3(2)A1 by adding the following: <br /> Provide a smooth, consistent, friable surface acceptable for all areas being <br /> seeded by raking or similar treatment acceptable for seeding as determined <br /> by the Engineer. <br /> Provide all areas being seeded free of all visible clods, rocks and debris <br /> measuring one-inch or larger in any dimension. <br /> ' 8-01.3(2)B Seeding and Fertilizing <br /> Supplement 8-01.3(2)B by adding the following: <br /> Use hydroseeding application method where feasible, uniformly apply a slurry <br /> of seed, fertilizer, mulch and water over all disturbed areas unless shown <br /> otherwise on the Plans. <br /> Use Seed Mix#1, as specified in 9-14.2 of these Special Provisions in restoring <br /> areas not having established lawns. Use Seed Mix#2 or#3, as specified in 9- <br /> 14.2 of these Special Provisions, for restoring areas with established lawns. <br /> Apply permanent seed mixture #1 and #2 uniformly over the areas being <br /> restored at a rate of 4-pounds per 1,000 square feet. <br /> Apply permanent seed mixture#3 uniformly over the areas being restored at a <br /> rate of 7-pounds per 1,000 square feet. <br /> Apply temporary seed mixture uniformly over the areas being restored at a rate <br /> of 2-pounds per 1,000 square feet. <br /> Apply starter fertilizer in accordance with Section 9-14.3 at a rate of 8 pounds <br /> per 1,000 square feet. For hydroseeding application, incorporate the fertilizer <br /> into the seed, mulch and water slurry and apply in accordance with these <br /> Special Provisions. <br /> 8-01.3(2)D Mulching <br /> Supplement 8-01.3(2)D by adding the following: <br /> ' Apply wood cellulose fiber at the rate of 60 pounds per 1,000 square feet. <br /> 8-01.3(8) Street Cleaning <br /> Delete 8-01.3(8) and substitute the following: <br /> 1 Provide self-propelled pickup sweepers equipped with water spray systems for dust <br /> control and designed and operated to meet air quality standards for pavement <br /> cleaning and debris removal as required. The use of supplementary water to <br /> suppress dust while performing cleaning Work shall be held to a minimum unless <br /> designated otherwise by the Engineer. <br /> Plan construction operation to minimize the need for street cleaning. <br /> Sweep streets and roadways as needed at least once per day. Sweep all roadway <br /> areas subject to construction traffic within the Project area and connecting streets, <br /> preferably during non-peak use hours of the Project site. More frequent cleaning <br /> ' may be required, as directed by the City's Inspector, as conditions warrant. <br /> Clean up spills immediately. Failure to clean streets or spills as required will result <br /> in City procuring street cleaning services, or cleaning streets themselves at City <br /> overtime rates. Either way, Contractor shall be responsible for reimbursing the City <br /> Water Main Replacement"V" Division 8—MISC CONSTRUCTION April,2021 <br /> WO No.—UP3730 SP—187 <br />
The URL can be used to link to this page
Your browser does not support the video tag.