Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> for cost incurred. If Contractor fails to promptly reimburse City then City will deduct <br /> cost, plus interest on unpaid balance, from Contractor's final payment. <br /> 8-01.3(9) Sediment Control Barriers <br /> 8-01.3(9)A Silt Fence <br /> Delete the fifth paragraph in 8-01.3(9)A and substitute the following: <br /> Provide steel posts consisting of U, T, L or C shape posts with a minimum <br /> weight of 1.35 Ibs/ft, or other steel posts having equivalent strength and <br /> bending resistance to the posts listed. Provide silt fence conforming to COE <br /> Standard Drawing 214. <br /> 8-01.3(15) Maintenance <br /> Delete the fifth paragraph of 8-01.3(15). <br /> 8-01.3(16) Removal <br /> Revise the first paragraph of 8-01.3(16) to read as follows: <br /> The Contractor shall remove all temporary BMPs and all associated hardware 1 from the project limits prior to Physical Completion unless otherwise approved <br /> by the Engineer. All permanent stabilization of disturbed areas shall be <br /> completed prior to removal of temporary BMPs I <br /> At the request of the Contractor and at the sole discretion of the Engineer the <br /> CSWGP may be transferred back to the City. Approval of the Transfer of <br /> Coverage request will require the following: <br /> 1. All other Work required for Contract Completion has been <br /> completed. 111 <br /> 2. All Work required for compliance with the CSWGP has been <br /> completed to the maximum extent possible. This includes removal <br /> of BMPs that are no longer needed and the site has undergone all <br /> Stabilization identified for meeting the requirements of Final <br /> Stabilization in the CSWGP. <br /> 3. An Equitable Adjustment change order for the cost of Work that has <br /> not been completed by the Contractor. <br /> 4. Submittal of the Washington State Department of Ecology Transfer <br /> of Coverage form (Ecology form ECY 020-87a)to the Engineer. <br /> If the Engineer approves the Transfer of Coverage back to the City the <br /> requirement in 1-07.5(3) for the Contractor's submittal of the Notice of <br /> Termination form to Ecology will not apply. <br /> 8-01.4 Measurement 111 <br /> Delete all paragraphs in 8-01.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 8-01.5 Payment <br /> Delete all paragraphs in 8-01.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Water Main Replacement"V" Division 8—MISC CONSTRUCTION April,2021 <br /> WO No.—UP3730 SP—188 I <br />