My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> recompact the subgrade at the bottom of the planting pit to prevent settling. Pull <br /> bark mulch back from the base of plants. <br /> 8-02.3(11) Bark or Wood Chip Mulch <br /> Supplement 8-02.3(11) by adding the following: <br /> Place bark mulch over all planting areas to the depth shown on the Plans. <br /> Thoroughly water and hose down plants with a fine spray to wash the leaves of the <br /> plants immediately after application. <br /> 8-02.3(13) Plant Establishment <br /> Supplement 8-02.3(13) by adding the following: <br /> Plant establishment consists of insuring resumption and continued growth of all <br /> planted material including seeding for a period of one year. This includes, but is not <br /> limited to, labor and materials necessary for removal and replacement of any <br /> rejected plant material planted under this Contract. The Contractor shall be <br /> responsible for watering all seeded areas and planting areas sufficiently to establish <br /> and maintain a thriving condition throughout the duration of the plant establishment <br /> period. <br /> 8-02.3(16) Lawn Installation <br /> 8-02.3(16)A Lawn Installation <br /> Delete 8-02.3(16)A and substitute the following: <br /> 8-02.3(16)A Lawn Installation—Sod or Seed <br /> Install sod in irrigated areas only after the irrigation system is fully operational. <br /> Provide seed mix and in accordance with the Section 9-14.2. Apply at the rates ' <br /> specified in 8-01.3(2)B. <br /> Unless the Engineer approves otherwise, install seed or sod between March 1 <br /> through May 15 and September 1 through October 1. <br /> Contractor has option of sodding in lieu of seeding lawn installations at no additional <br /> expense. City will NOT allow seeding in lieu of sodding. <br /> Place sod strips within 48-hours of being cut. Place strips without voids and stagger <br /> the end joints. Roll sod with a smooth roller following placement to ensure good <br /> contact with the soil. <br /> During the establishment period, erect barriers, with warning signs where <br /> necessary, to preclude pedestrian traffic over the newly placed sod or seed. <br /> Prepare areas for sod in accordance with standard horticultural practices as follows: <br /> 1. Rototill, or otherwise cultivate, to a minimum depth of 4-inches into the <br /> ground surface. Thoroughly incorporate a 10-2-10 fertilizer in the rototilling <br /> process at a rate of 4 pounds of available Nitrogen per 1000 square feet. <br /> 2. Rake the surface to even grade without low spots to trap water and round <br /> surface to match surroundings. <br /> 3. Add topsoil as required by the design. <br /> NOTE: Topsoil will be paid for separately if required. <br /> 4. Lightly dampen and compact the finished grade. ' <br /> 5. Install sod taking care to butt each piece tightly against the adjacent one. <br /> Stagger butt joints. Lay sod on sloped areas with the long dimension <br /> parallel to the toe or top of slope. After placing, roll the sod and sprinkle <br /> heavily with water. <br /> 6. Provide tools specially designed for the work and satisfactory to the <br /> Engineer. I <br /> Water Main Replacement"V" Division 8—MISC CONSTRUCTION April, 2021 <br /> WO No.—UP3730 SP—190 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.