Laserfiche WebLink
Project Limits: Fulton, Pine, Maple Streets, or midblock alley connections between California <br />Street and Hewitt Avenue. <br />Project Elements: Provide a bicycle facility connecting California Street and Hewitt Avenue on <br />one of the three streets in the project limits Bicycle facility shall consist of pavement markings, <br />signage, wayfinding signage and may include vertical elements (concrete or physical devices) in <br />buffers, curbed shared use path/sidewalks, stop control, signal, or signal modifications depending <br />on the preferred alternative. Provide sidewalk in any sidewalk gaps on both sides of the road <br />within the project limits. Upgrade all ADA ramps within the project limits which do not meet <br />current ADA standards. <br />Segment C: Hewitt Avenue to US 2 Multimodal Improvements <br />Project Limits: Hewitt Avenue between the California Street to Hewitt Avenue Connection and the <br />U S 2 trail east of 1-5. <br />Project Elements: Provide bicycle facilities on Hewitt Avenue connecting the California Street to <br />Hewitt Avenue connection along Hewitt Avenue, under Interstate 5 and connecting to the existing <br />U S 2 trail entrance on the east side of the US 2 on -ramp from Hewitt Avenue Bicycle facility shall <br />consist of pavement markings, signage, wayfinding signage, and may include vertical elements <br />(concrete or physical devices) in buffers, signals, signal modifications or rectangular rapid <br />flashing beacons depending on the preferred alternative. Provide sidewalk in any sidewalk gaps <br />on both sides of the road within the project limits. Upgrade all ADA ramps within the project limits <br />which do not meet current ADA standards. <br />Assumptions <br />The Consultant has developed this scope with the following assumptions. <br />This Scope of Services assumes the following: <br />• Computer Aided Drafting (CAD) will be performed using AutoCAD version 2019. CAD files will be <br />provided to the City at the completion of each phase. <br />• All other deliverables besides the CAD files will be provided electronically via PDF and in their <br />original file format. <br />• City of Everett Design and Construction Standards and CAD standards will be used as a starting <br />point for preparing design concepts and throughout project development. <br />• The City will provide to the consultant all CAD standard files, existing survey data, and any <br />relevant GIS data. <br />• A conceptual design will be identified via the tasks in Phase 1 and subsequent phases will be <br />revisited following the identification of a preferred alternative to confirm the scope and fee match <br />the Consultant's estimated level of effort based on the preferred alternative. <br />• Translation services for stakeholder and public outreach are not required <br />Phase 1 —Preliminary Analysis and Design <br />The first phase of the project is focused on identifying a range of alternatives to connect the intersection <br />of California and Broadway with the US 2 trail near the intersection of the US 2 eastbound ramp at Hewitt <br />Avenue and Chestnut Street. Phase 1 will conclude with the selection of a preferred alternative alignment, <br />channelization concept, sidewalk and shared use path alignments and intersection treatments. <br />transpogroup te- <br />Page 2 <br />