Laserfiche WebLink
alternative may not be the preferred alternative of all stakeholders, and may not be the best satisfaction of <br />every criteria, but will represent the best balance of meeting the most criteria. <br />Consultant Deliverables <br />• Technical memorandum documenting evaluation criteria <br />• Alternatives comparison matrix, prepared and presented as both a technical memorandum and a <br />graphical format (slides, boards, etc.) for stakeholder outreach <br />Task 1-5 — Preliminary (30%) Design <br />1-5.1 Preliminary Design <br />For the preliminary design, the Consultant and subconsultants shall develop the appropriate <br />channelization, signing, cross -sections, sidewalks and shared use paths drainage, landscaping, <br />intersection, and traffic signal improvements, as appropriate to the selected preferred alternative. A traffic <br />signal design plan will be prepared for any modifications to the signalization in the preferred alternative <br />which will show pole and signal head locations, mast arm lengths, and location of ADA-compliant <br />pedestrian signal heads and pushbuttons. Upgrades to existing pushbutton systems and curb ramps are <br />expected at signalized and unsignalized intersections in the project corridor. <br />Consultant Deliverables <br />• Preliminary design level corridor plans including: <br />o Cover Sheet with Vicinity Map and Index <br />o Typical Roadway Sections <br />o Sidewalk and Shared Use Path Plans <br />o Striping and Signing Plans <br />o Drainage and Landscape Architecture Plans (Osborn Consulting) <br />o Retaining Walls (if needed,) <br />o Traffic Signal Plans (if needed) <br />o Planning level cost estimate. <br />1-5.2 WSDOT Channelization Plan <br />The Consultant shall prepare a channelization plan for approval for the corridor segment between Maple <br />Street and the US 2 Eastbound Ramp intersection. The latest version of the Northwest Region <br />Intersection / Channelization Plan for Approval Checklist will be utilized. A draft copy including the <br />preliminary design will be submitted for review by the City and WSDOT. <br />Consultant Deliverables <br />• Draft WSDOT Channelization Plan for Approval <br />1-5.3 NEPA and SEPA Documentation <br />The Consultant will assist the City with the WSDOT NEPA kickoff meeting following identification of a <br />preferred alternative and the beginning of conceptual design. The work included with this task will include <br />documentation for the anticipated categorical exclusion and identification of work items that will need to <br />be completed in Phase 2 in order to complete the NEPA documentation. <br />Documentation of NEPA elements that are independent of detailed project design will be prepared for this <br />task. Similar data required for the SEPA documentation of the project will be prepared in draft format, <br />anticipating the need to capture further information about the detailed project design in Phase 2 <br />rranspo9roup cilr <br />Page 6 <br />