Laserfiche WebLink
A summary of all outreach efforts and the resulting feedback will be prepared and included with the <br />project design documentation. <br />Consultant Deliverables <br />• Draft and final engagement strategy <br />• Procured project mailing list <br />• Branding kit <br />• Project briefing kit with updates <br />• Draft and final versions of the online open house, online survey, and a project graphics/flyer <br />• Draft and final media advertisements. <br />• Draft and final versions of an event planner <br />• Preliminary Draft version of the outreach summary and appendices. <br />Task 1-7 —Vacant <br />Schedule <br />The anticipated schedule for Phase 1 is approximately 6 months. The following milestones are <br />anticipated for Phase 1: <br />• Project kickoff meeting <br />• First stakeholder meeting <br />• Alternatives identification meeting(s) with City <br />• Alternatives criteria identification and meeting(s) with the City <br />• Alternatives evaluation meeting(s) with the City <br />• Development of the second stakeholder meeting process <br />o Conducting of the second stakeholder meeting <br />o Support of the third stakeholder meeting with Everett's Transportation Advisory <br />Committee. <br />• Identification of a preferred alternative <br />• Completion and submittal of a 30% PS&E package <br />• Submittal of a draft PFA <br />tra nspo coup kgr <br />Page 8 <br />