Laserfiche WebLink
Phase 2 — Design Engineering <br />The Consultant will prepare design plans, specifications, and estimates for 60%, 90%, and 100% (final) <br />levels of design. Plan sheets will be developed using the City CAD standards at a 1"=20' full size scale <br />that allows for approximately 500 feet per plan "window". Two plan windows will be used on sheets where <br />feasible to reduce the total number of sheets and proposed work can be clearly and concisely conveyed <br />to contractors. Topics may be combined on sheets, as listed or per City approval to reduce the total <br />number of sheets in the final package. Any deviations from this scope or approved City standard <br />practices shall require written prior approval from the City. <br />The Consultant will submit the design plans for review by the City. The City's review will identify issues, <br />resolve problems, recommend modifications, suggest actions required and provide direction and <br />guidance for the next stage of design. The City will closely monitor the design plan preparation process <br />and be responsive to communication from the Consultant to assist in avoiding substantial revision during <br />the review process. This effort shall not alter the Consultant's responsibility for the work. <br />The Consultant will prepare the special provisions and applicable amendments to the contract provisions, <br />Divisions two through nine, as required for the improvements. The City of Everett will prepare the Division <br />one specifications. The City of Everett will compile the final specifications for bid. The contract provisions <br />shall be prepared in accordance with the requirements of WSDOT and the City of Everett. The Consultant <br />shall prepare special provisions for those items not covered by the standard specifications, general <br />special provisions or amendments. <br />The Consultant will prepare quantity estimates and backup calculations in accordance with the WSDOT <br />bid item descriptions. Final quantity estimates and bid item list will be prepared according to WSDOT <br />format and backup calculations for lump sum and unit price items will be provided Quantity estimates will <br />be used to prepare the summary of quantity sheets, and all other material required for construction. <br />Quantities will be combined into a single bid package. <br />The Consultant will maintain a construction cost estimate throughout the project, updated at each design <br />milestone. The estimate will be developed in Excel format. The consultant will include a justification <br />summary for quantity and unit price estimates in the submittal. <br />All electronic materials used to generate the Bid Set Plans, Specifications and Estimate will be submitted <br />to the City Drawings will be submitted in PDF and AutoCAD/AutoCAD Civil 3D format Specifications will <br />be submitted in editable Microsoft Word format. The Estimate will be submitted in editable Microsoft Excel <br />format. File naming will follow the City of Everett Public Works Department Standards for CAD and <br />Graphics dated June 2018. <br />Task 2-1 — Project Management <br />The tasks, roles and expectations for Task 2-1 are the same as for Task 1-1. The following additional <br />meetings are anticipated for Task 2-1: <br />1. 30% Design Plans, Specifications and Estimate comment resolution <br />2. 60% Design Plans, Specifications and Estimate comment resolution <br />3. 90% Design Plans, Specifications and Estimate comment resolution <br />Task 2-2 60% and 90% Design <br />2-2.1 60% Submittal <br />The 60% submittal will include drawings, special provisions, and the Engineer's estimate. The Consultant <br />and subconsultants will review the design, provide additional engineering detail and assessment of <br />transpogroup Vie <br />Page 9 <br />