My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/06/30 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/06/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:31:31 PM
Creation date
7/2/2021 2:58:48 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/30/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
design concerns identified in the 30% plans and note any outstanding design issues in Notes to <br />Reviewer. An AGi 32 illumination analysis will be performed as part of the 60% submittal and <br />recommended lighting improvements to meet City of Everett lighting standards for active mode facilities <br />will be included in the plans. All 30% plan submittal comments received will be incorporated into the <br />submittal. The City will review the submittal and return a consolidated set of comments to the Consultant. <br />The review period will last two weeks. The 60% plans will include the following sheets: <br />• Cover Sheet with Vicinity Map and Index <br />• Legend and Abbreviations <br />• Site Preparation and TESC Plans and Details <br />• Roadway, Sidewalk and Shared Use Path Paving Plans <br />• Roadway, Sidewalk and Shared Use Path Details <br />• Striping and Signing Plans <br />• Traffic Signal Plan (if needed) <br />• Illumination Plan (if needed) <br />• Drainage Plan and report (if needed) <br />• Landscaping Plan (if needed) <br />• Retaining Wall Details (if needed) <br />The standard and custom design details will utilize City of Everett and WSDOT standards. <br />KBA will provide a constructability review at the 60% design level. <br />Consultant Deliverables <br />• Comment response letter/matrix from 30% submittal. <br />• One electronic PDF copy of 60% Plans. <br />• One electronic copy of CAD files for 60% plans. <br />• Cost estimate in Excel format. <br />• Special provisions (except Division 1) in Word format. <br />2-2.2 90% Submittal <br />The 90% submittal will include all drawings, special provisions, and the Engineer's estimate. The <br />Consultant and subconsultants will review the design, update most outstanding design tasks, note any <br />outstanding issues in Notes to Reviewer and incorporate City comments. The 60% Design Plan submittal <br />comments will be incorporated into the 90% submittal. The City will review the submittal and return one <br />set of consolidated comments to the Consultant. The review period will last two weeks. In addition to <br />modifications to the sheets identified for the 60% submittal, traffic signal wiring diagrams (if needed), <br />signal details (if needed), and traffic control plans (Task 2-4) will be prepared. The following additional <br />sheets will be included with the 90% submittal: <br />• Traffic Control Plans and Details <br />• Traffic Signal Wiring Diagram (if needed) <br />• Traffic Signal Details (if needed) <br />KBA will provide a constructability review at the 90% design level. <br />Consultant Deliverables <br />• Comment response letter/matrix from 60% submittal. <br />• One electronic PDF copy of 90% Plans. <br />• One electronic copy of CAD files for 90% plans. <br />• Cost estimate in Excel format. <br />• Special provisions (except Division 1) in Word format. <br />transpogroup cir <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.