2=2.3 Traffic Contrail Plans and Detour Routes <br />The Consultant will prepare traffic control plans as part of the development of design Plans for the <br />preferred alternative. Traffic control plans will follow the standards and requirements of the City of Everett, <br />WSDOT and the MUTCD Site -specific traffic control plans will be provided for all improvements, aligned <br />with the requirements for Federally -funded projects. <br />The Consultant will participate in one (1) meeting, arranged by the City, with the Everett Police and Fire <br />Departments to present conceptual traffic control plans and detour routes and gather feedback. <br />Traffic Control Plans and detour routes will be designed on Plan sheets consistent with the approach <br />outlined in Task 2-2 The plans for traffic control and detours will be included in the plan sets submitted as <br />part of Tasks 2-2 and 2-7. <br />The specifics of the routes, necessity of detours and limits of traffic control will be dependent on the <br />preferred alternative selected in Phase 1. <br />2-2.4 Utility Coordination <br />The Consultant will assist the City with coordination with City -provided and franchise utilities affected by <br />the preferred alternative. The Consultant will identify affected franchise utilities as identified in the original <br />survey provided by the City and any supplemental survey gathered in Task 2-3. The Consultant will assist <br />the City in providing the needed information on the depth, width and scope of project elements that may <br />affect utilities and require relocation of aerial or underground utilities. The Consultant will assist the City in <br />communicating and coordinating relocation schedules for utilities to ensure there are not undue delays in <br />the construction of the Project. <br />The Consultant will identify utilities and indicate relocation on the Plan sheets developed in Tasks 2-2 and <br />2-7. The City will provide utility design services for relocated water utilities, including hydrants. <br />The specifics of utilities that may be affected by the Project will be dependent on the preferred alternative <br />selected in Phase 1. <br />2-2.5 WSDOT Channelization Plan <br />The Consultant shall update the channelization plan for approval for the corridor segment between Maple <br />Street, the southbound 1-5 ramp, Hewitt Ave, and the US 2 Eastbound Ramp intersection. The latest <br />version of the Northwest Region Intersection / Channelization Plan for Approval Checklist will be utilized. <br />Comments from the City and WSDOT on the Plan from Phase 1 will be addressed and incorporated into <br />the channelization plan, and resubmitted to WSDOT for approval. Any additional review submittals <br />required by WSDOT beyond the one described above shall be considered extra services. Once WSDOT <br />has given their approval, one final full-sized reproducible Mylar set for WSDOT's record copy, if required, <br />will be produced. <br />Consultant Deliverables <br />• Draft WSDOT Channelization Plan for Approval (1 iterations) <br />• Mylar plans for WSDOT (if required) <br />• Final signed WSDOT Channelization Plan for Approval <br />Task 2-3 Supplemental Survey and Right of Way <br />The Consultant has received survey data from the City as part of the project kickoff (Phase 1) Depending <br />on the preferred alternative selected in Phase 1, additional survey may be required to complete the <br />design in Phase 2 Additional survey will include right of way information including: <br />transpogroup <br />Page 11 <br />