My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/06/30 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/06/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:31:31 PM
Creation date
7/2/2021 2:58:48 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/30/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Submittal of a PFA to WSDOT may require submittal of this design documentation. A separate design <br />documentation will not be provided for the WSDOT and City's purposes. Formatting and design <br />information requirements for the WSDOT PFA will govern the content provided by the Consultant for the <br />design documentation. <br />Consultant Deliverables <br />® Technical memorandum (PDF format) of design documentation at 90% design <br />• Technical memorandum (PDF format) of design documentation at 100% design <br />2.5-2 NEPA and SEPA Documentation <br />As part of the project documentation, the Consultant will assist the City with completing NEPA and SEPA <br />documentation that was initiated in Task 1-6 3 Updated information related to project details will be <br />added to the categorical exclusion documentation provided to the City. <br />The Consultant will respond to up to two (2) rounds of comments from WSDOT on the NEPA <br />documentation and the City of Everett on the SEPA documentation of the project within this scope. <br />Further comments may result in additional scope and fee. <br />Consultant Deliverables <br />• Draft and Final NEPA Documentation <br />• Draft and Final SEPA Documentation <br />2.5-3 Cultural Resources <br />Supporting the NEPA and SEPA documentation, as well as the geotechnical investigation, the Consultant <br />will provide, through a subconsultant, cultural resources assessments and mitigation plans, if necessary, <br />for any subsurface objects of significance discovered through the design in Phase 2 <br />Task 2-6 100% Final Design <br />The 100% package will include completed drawings, special provisions, and the final Engineer's estimate. <br />The Consultant and subconsultants will address any final outstanding design issues and respond to <br />comments. The 90% PS&E Plan submittal comments will be incorporated into the submittal. The <br />Consultant will make no further changes to the documents and plan design following completion of this <br />task without the approval of the City. <br />Consultant Deliverables <br />• <br />• <br />• <br />• <br />Comment response letter/matrix from 90% submittal. <br />One electronic PDF copy of Final Plans. Each sheet shall be stamped and signed by the <br />Consultant and the City project manager. <br />Cost estimate in Excel format. <br />Special provisions (except Division 1) in Word format. <br />Final electronic CAD files. <br />Task 2-7 Public and Stakeholder Involvement <br />During Phase 2, public and stakeholder involvement will be less than in Phase 1 but will still be an <br />important component of the project. The City will continue to lead the process, and the Consultant and <br />tra nspoc coup ki�f <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.