Laserfiche WebLink
subconsultants will provide planning and material support for coordination efforts. Stakeholder <br />involvement during Phase 2 could include, but is not limited to: <br />• Outreach to public service and utility providers in the corridor to comment on the final design, <br />traffic control and implementation plans <br />• Outreach to City of Everett police and fire department representatives for input on traffic control <br />and implementation plans <br />• Support consisting of exhibits and graphics to present to the City of Everett TAC meeting. <br />• Presentations to the City Council to provide project design updates <br />• Outreach to grant funding partners to keep them appraised of project progress and construction - <br />readiness in anticipation of securing construction funding <br />Coordination with WSDOT's ongoing US 2 studies, both eastbound and westbound, will continue through <br />Phase 2 It is anticipated that WSDOT's planning teams will have comments and input on the design of <br />the preferred alternative as it progresses through Phase 2 The Consultant will assist the City in preparing <br />and conducting project updates with the WSDOT planning teams at the 60%, 90% and 100% design <br />levels to ensure input and concurrence by WSDOT with the final design. It is anticipated that through this <br />outreach process, WSDOT will incorporate the City's final design for the connection to the US 2 trail in <br />recommendations for the US 2 interchange modification project(s). <br />A summary of all outreach efforts and the resulting feedback will be prepared and included with the <br />project design documentation. <br />Consultant Deliverables <br />• Exhibits, graphics and information requests to support stakeholder outreach <br />• Attendance at or support for stakeholder meetings, TAC and Council presentations and WSDOT <br />meetings <br />• Draft, and Final version of the outreach summary and appendices. <br />Task 2-8 Grant Funding Assistance <br />The Consultant will provide grant funding assistance to the City, in late 2021 and into 2022, focused on <br />three grant programs that could be candidates for construction funding for the Project, or a segment of <br />the Project: <br />• Transportation Improvement Board (TIB) process for 2022 <br />• WSDOT Pedestrian/Bicycle program for 2022 <br />• PSRC Surface Transportation Fund and Congestion Mitigation and Air Quality Fund for 2022 <br />The Consultant or the City may identify grant funding opportunities in addition to those listed above and <br />will provide application assistance as outlined below or as required by the funding agency. <br />If the project, or a segment of the project, is a good application candidate, the Consultant will prepare the <br />grant funding applications on behalf of the City. The Consultant will request necessary planning <br />information and statements to remain consistent with City planning efforts in preparing the grant <br />application. The plans and estimate prepared for Task 2-6 will inform the grant application and documents <br />prepared for that task will be included as attachments to the grant funding application. <br />The Consultant will provide support for interviews as part of the grant application process, including the <br />preparation of handouts, presentations and supporting and/or delivering the presentation to grant funding <br />agencies on behalf of the City at the City's request. <br />Consultant Deliverables <br />• 2022 TIB grant application for Project construction funding <br />• 2022 WSDOT Pedestrian/Bicycle program grant application and interview support <br />transpogroup =Jr <br />Page 14 <br />