Laserfiche WebLink
Osborn Consulting, Inc. 4/7/21 <br />• Concepts to be summarized using hand sketches, with photos of similar treatment to provide <br />clarity <br />Task 1-5 Preliminary (30%) Design <br />Development of 30% design plans for the preferred alternative's drainage and landscape architecture <br />features <br />Assumptions: <br />• Drainage design to be shown on 8 plan sheets at 20 scale, no profiles or details <br />• Landscape architecture treatments — showing areas of plantings by zones and street tree <br />locations to be shown on 4 plan sheets at 20 scale, with example photo of similar treatment <br />when required for clarity, no details or site furnishings <br />• No planting schedule <br />• No detailed stormwater modeling or memorandum. <br />• No specifications <br />Deliverables: <br />• Drainage 30% design plans <br />• Landscape Architecture 30% design plans <br />• Drainage 30% cost estimate <br />• Landscape Architecture 30% cost estimate <br />Phase 2 <br />Task 2-2.1 60% and 90% Design (Drainage) <br />Development of 60% and 90% design p ans, Specification and Cost Estimate (PS&E) for the preferred <br />alternative's drainage approach. Drainage design to be shown on 8 plan sheets with pipe profiles at 20 <br />scale, 2 detail sheets for non-standard items. <br />Assumptions: <br />• <br />• <br />• <br />• <br />• <br />• <br />Standard details (City of Everett and WSDOT) will referenced on the detail sheets, not included. <br />All design plans shall conform with City of Everett Design and Construction Standards and CAD <br />standards as described in Exhibit A. <br />Edits to the City's Special Provisions will be based on the current year edition of WSDOT <br />Standard Specifications. <br />Cost estimate to include a justification of quantity and unit price <br />Utility conflict can be resolved at the point of conflict with simple adjustment of the utilities or <br />storm drainage locations. Relocating utilities is not included. <br />There will only be minor changes to the project design after the 90% submittal. <br />