Laserfiche WebLink
Osborn Consulting, Inc. 4/7/21 <br />Deliverables: <br />• PDF and electronic CAD files for Drainage 60% and 90% design plans <br />• Specifications and cost estimate (PDF, Word file for specifications, Excel file for cost estimate) <br />• Stormwater Site Plan 60% and 90% (PDF and electronic CAD files) <br />• Draft SWPPP, Draft (60%) and Final (90%) (PDF) <br />Task 2-2.2 60% and 90% Design (Landscape Architecture) <br />Development of 60% and 90% design plans, Specification and Cost Estimate (PS&E) for the preferred <br />alternative's approved landscape architecture features. <br />Planting plan and street tree plan, showing planting zones and tree locations up to 60%; plant locations <br />and plant types for 90%; specifications for plant care and establishment, including instructions for truck <br />or hand watering. Landscape architecture to be shown on 4 plan sheets at 20 scale, with 3 detail sheets <br />for non-standard details. <br />Assumptions: <br />• Standard details (City of Everett and WSDOT) will referenced on the detail sheets, not included. <br />• All design plans shall conform with City of Everett Design and Construction Standards and CAD <br />standards as described in Exhibit A. <br />• Edits to the City's Special Provisions will be based on the current year edition of WSDOT <br />Standard Specifications. <br />• Cost estimate to include a justification of quantity and unit price <br />• No sketches or photo realistic renderings are included. <br />• There will only be minor changes to the project design after the 90% submittal. <br />• A list of acceptable and available street furniture will be provided by the City. <br />• Street trees shall be per the City approved street tree list. <br />• Irrigation design not included <br />Deliverables: <br />• PDF and electronic CAD files for Landscape Architecture 60% and 90% design plans <br />• Specifications and cost estimate 60% and 90% (PDF, Word file for specifications, Excel file for <br />cost estimate) <br />Task 2-6.1 100% Final Design (Drainage) <br />Development of 100% design plans, Specification and Cost Estimate (PS&E) for the preferred <br />alternative's drainage approach. Drainage design to be shown on 8 plan sheets with pipe profiles at 20 <br />scale, 2 detail sheets for non-standard items. <br />Assumptions: <br />• Standard details (City of Everett and WSDOT) will referenced on the detail sheets, not included. <br />