My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 (******) <br /> 2 Pavement markings shall be installed in accordance with Section 8-22.3 of the Standard <br /> 3 Specifications with the following modifications: <br /> I 4 <br /> 5 1. All Stop Line shall be 24" wide Type D extruded plastic flat line. Spray Type D is <br /> 6 not allowed. <br /> I7 2. All Crosswalk Line shall be solid white lines, 24"wide, installed in accordance with <br /> 8 City of Everett Standard Drawing No. 721 and shall be Type D extruded plastic <br /> 9 flat line. Spray Type D is not allowed. <br /> I <br /> 10 3. All two-way left turn yellow lines and lane lines dividing two opposing directions of <br /> Ill travel shall be Type D plastic flat line. <br /> 12 4. All white parking lines shall be plastic line. <br /> I13 5. All wide line and dotted extension line shall be Type D plastic flat line. <br /> 14 6. Access parking space symbols, arrows, letters, bicycle symbols, railroad crossing <br /> 15 symbols, sharrow symbols, and speed hump symbols shall be Type D extruded <br /> 16 plastic flat line. Spray Type D is not allowed. <br /> I 17 <br /> 18 8-22.3(1) Preliminary Spotting <br /> 19 <br /> 20 Section 8-22.3(1) is supplemented with the following: <br /> 21 <br /> 22 (**- ) <br /> 23 Contractor Surveying — Roadway Striping and Channelization <br /> I24 <br /> 25 No survey control data or layout will be furnished by the Contracting Agency. <br /> 26 The Contractor shall be solely responsible for detailed documentation (records) <br /> I 27 of all existing pavement markings and channelization in the field prior to grinding <br /> 28 operations. This work includes but is not limited to: field notes, sketches, offset <br /> 29 markings on curbs or staking if no curb exists. <br /> I 30 <br /> 31 The records and offset marking/staking shall be adequate to allow the pavement <br /> 32 markings to be reproduced to a level of accuracy shown below: <br /> I 33 <br /> 34 Lane widths ±0.1 feet (normal to alignment) <br /> 35 Longitudinal location of arrows and letters ±1.0 feet (parallel to alignment) <br /> I 36 Longitudinal location of stop lines ±1.0 feet (parallel to alignment) <br /> 37 Transverse location of arrows and letters ±0.1 feet (normal to alignment) <br /> 38 Longitudinal location of transitions and tapers±1.0 feet (parallel to alignment) <br /> I 39 Pavement marking starts and stops ±1.0 feet (parallel to alignment) <br /> 40 <br /> 41 The Contractor shall provide copies of any calculations, notes, and layout data <br /> 42 to the Engineer, or their assigned representative, prior to grinding. The <br /> I 43 Contracting Agency will review the provided data, check the existing layout and <br /> 44 provide revisions as necessary for establishment of lane widths, arrow and letter <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 81 OF 84 DIVISION T <br /> WORK ORDER 3751 Addendum 1 APRIL 5,2021 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.