Laserfiche WebLink
Project: Sewer"0"Utility Upgrades <br /> Change Order No. 1 <br /> Change Order Effective Date: May 4,2021 <br /> • <br /> Bid Item#40—Planing Bituminous Pavement(2-inch deep). Modify existing bid item#40 by <br /> deducting 4,106 square yards of Planing Bituminous Pavement(2-inch deep), at the unit price of$5.00 <br /> per square yard, resulting in a($20,530.00) contract price decrease. <br /> Bid Item#41 —Cement Concrete Sidewalk Restoration. Modify existing bid item#41 by deducting <br /> 544 square yards of Cement Concrete Sidewalk Restoration, at the unit price of$66.00/SY,resulting in <br /> a($36,564.00)contract price decrease. <br /> Bid Item#48—Adjust Existing Monument Casing to Grade. Modify existing bid item#48 by deleting <br /> 3-each Adjust Existing Monument Casing to Grade @ the unit price of$3,000.00/each,resulting in a <br /> ($9,000.00)contract price decrease. <br /> Bid Item#51 —Plastic Stop Line. Modify existing bid item#51 by deleting 190 linear feet of Plastic <br /> Stop Line @ the unit price of$20.00/LF,resulting in a($3,800.00)contract price decrease. <br /> Bid Item#52—Plastic Crosswalk Line. Modify existing bid item#52 by deleting 800 linear feet of <br /> Plastic Crosswalk Line @ the unit price of$20.00/LF,resulting in a($16,000.00) contract price <br /> decrease. <br /> Bid Item#53 —Removing Plastic Crosswalk Line. Modify existing bid item#53 by deleting 580 linear <br /> feet of Removing Plastic Crosswalk Line @ the unit price of$5.50/SF,resulting in a($3,190.00) <br /> contract price decrease. <br /> Bid Item#54—Removing Plastic Stop Line. Modify existing bid item#54 by deleting 130 square feet <br /> of Removing Plastic Stop Line @ the unit price of$5.50/SF,resulting in a($715.00)contract price <br /> decrease. <br /> Bid Item#55—Plastic Arrow. Modify existing bid item#55 by deleting 12 each Plastic Arrows @ the <br /> unit price of$725.00/EA, resulting in a($8,700.00) contract price decrease. <br /> Bid Item#56—Removing Plastic Arrow. Modify existing bid item#56 by deleting 12 each Removing <br /> Plastic Arrows @ the unit price of$350.00/EA,resulting in a($4,200.00) contract price decrease. <br /> Bid Item#57—Plastic Line. Modify existing bid item#57 by deleting 3,660 linear feet of Plastic Line <br /> @ the unit price of$2.25/LF,resulting in a($8,235.00)contract price decrease. <br /> Bid Item#58—Plastic Wide Line. Modify existing bid item#58 by deleting 150 linear feet of Plastic <br /> Wide Line @ the unit price of$4.00/LF,resulting in a($600.00) contract price decrease. <br /> Bid Item#60—Force Account. Modify bid item#60 by deducting $100,000.00 from this bid item, <br /> resulting in a($100,000.00) contract price decrease. <br /> Schedule A: -New Items <br /> New Item 106—Survey Monument Case&Cover. Create new item#106 entitled"Survey Monument <br /> Case&Cover",by adding 3-each Survey Monument Case &Covers @ the agreed upon unit price of <br /> $3,325.00/each,resulting in a$9,975.00 contract price increase. <br /> Page 4 of 8 <br />