Laserfiche WebLink
Project: Sewer"0"Utility Upgrades <br /> Change Order No. 1 <br /> Change Order Effective Date: May 4,2021 <br /> New Item 107—Deletion of Traffic Loop Installations @ 37th& 39th of Colby Avenue. Delete the <br /> installation of Traffic Loops under Bid Item#49 in the lump sum amount of$12,500.00 and Traffic <br /> Loops under Bid Item#50 in the lump sum amount of$6,000.00 for a combined contract price <br /> decrease in the amount of($18,500.00). <br /> New Item 108—Equitable Adjustment. Create new item#108 entitled,"Equitable Adjustment",in <br /> the agreed upon lump sum amount of$230,607.48, resulting in a$230,607.48 contract price increase. <br /> Schedule B: -Modified Items <br /> Bid Item#64—Traffic Control Labor. Modify existing bid item#64 by adding 1,073 hours of Traffic <br /> Control Labor @ the unit price of$62.00/hour, resulting in a$66,526.00 contract price increase. <br /> Bid Item#65—Traffic,Control—Off-Duty Police Officer. Modify existing bid item#65 by deducting <br /> $13,200.00 from this force account bid item,resulting in a($13,200.00)contract price decrease. <br /> Bid Item#70—Saw Cutting Existing Pavement. Modify existing bid item#70 by deducting 1,600 <br /> linear feet of Saw cutting Existing Pavement @ the unit price of$5.00/LF,resulting in a($8,000.00) <br /> contract price decrease. <br /> Bid Item#72—Crushed Surfacing Top Course. Modify existing bid item#72 by deducting 446 tons of <br /> Crushed Surfacing Top Course @ the unit price of$40.00/ton, resulting in a($17,840.00)contract <br /> price decrease. <br /> Bid Item#73 —Foundation Material, Class A or B. Modify existing bid item#73 by deducting 100 <br /> tons of Foundation Material, Class A or B @ the unit rate of$65.00/ton,resulting in a($6,500.00) <br /> contract price decrease. <br /> Bid Item#74—Crushed Surfacing Base Course. Modify existing bid item#74 by adding 1,620 tons of <br /> Crushed Surfacing Base Course @ the unit price of$25.00/ton,resulting in a$40,5000.00 contract <br /> price increase. <br /> Bid Item#96—Cement Concrete Pavement Base Type III(High Early Strength) For Trench Patch. <br /> Modify existing bid item#96 by adding 540 square yards of Cement Concrete Pavement Base Type <br /> III, (High Early Strength)For Trench Patch @ the unit price of$36.00/SY,resulting in a$19,440.00 <br /> contract price increase. <br /> Bid Item#98—HMA, for Overlay. Modify existing bid item#98 by deducting 320 tons of HMA,for <br /> Overlay @ the unit price of$110.00/ton,resulting in a($35,200.00)contract price decrease. <br /> Bid Item#99—Planing Bituminous Pavement(2-inch deep). Modify existing bid item#99 by <br /> deducting 2,022 square yards of Planing Bituminous Pavement(2-inch deep), at the unit price of$5.00 <br /> per square yard,resulting in a($10,110.00) contract price decrease. <br /> Page 5 of 8 <br />