Laserfiche WebLink
Item No. Item Description Schedule A Quantity Unit Rate Extention <br /> 4 Traffic Control Labor 1725 Hour 62 $ 106,950.00 <br /> 5 Traffic Control-Off Duty Police Officer -1 FA 25860 $ (25,860.00) <br /> 13 Foundation Material -191 Ton 65 $ (12,415.00) <br /> 14 Crushed Surfacing Base Course 1966 Ton 27 $ 53,082.00 <br /> 16 Control Density Fill -67 CY 170 $ (11,390.00) <br /> 29 Side Sewer Replacement -14 Each 2600 $ (36,400.00) <br /> Cement Concrete Pavement Base Type III(HES)for <br /> 37 Trench Patch 567 SY 39 $ 22,113.00 <br /> 40 Planing Bituminous Pavement(2-inch Depth) -4,106 SY 5 $ (20,530.00) <br /> 41 Cement Concrete Sidewalk Restoration -554 SY 66 $ (36,564.00) <br /> 48 Adjust Existing Monument Casing to Grade -3 Each 3000 $ (9,000.00) <br /> 51 Plastic Stop Line -190 LF 20 $ (3,800.00) <br /> 52 Plastic Crosswalk Line -800 LF 20 $ (16,000.00) <br /> 53 Removing Plastic Crosswalk Line -580 SF 5.5 $ (3,190.00) <br /> 54 Removing Plastic Stop Line -130 SF 5.5 $ (715.00) <br /> 55 Plastic Arrow -12 Each 725 •$ (8,700.00) <br /> 56 Removing Plastic Arrow -12 Each 350 $ (4,200.00) <br /> 57 Plastic Line -3660 LF 2.25 $ (8,235.00) <br /> 58 Plastic Wide Line -150 LF 4 $ (600.00) <br /> 60 Force Account -1 FA 100000 $ (100,000.00) <br /> 106 Survey Monument Case &Cover 3 Each 3325 $ 9,975.00 <br /> Deletion of Traffic Loop Installations at 37th &39th <br /> 107 &Colby Avenue -1 LS 18500 $ (18,500.00) <br /> 108 Equitable Adjustment 1 LS 230,607.48 $ 230,607.48 <br /> $Summary of Schedule A $ 106,628.48 <br /> $Item No. Item Description Schedule B $ - <br /> 64 Traffic Control Labor 1073 Hour 62 $ 66,526.00 <br /> 65 Traffic Control-Off Duty Police Officer -1 FA 13200 $ (13,200.00) <br /> 70 Sawcutting Existing Pavement -1600 LF 5 $ (8,000.00) <br /> 72 Crushed Surfacing Top Course -446 Ton 40 $ (17,840.00) <br /> 73 Foundation Material -100 Ton 65 $ (6,500.00) <br /> 74 Crushed Surfacing Base Course 1620 Ton 25 $ 40,500.00 <br /> Cement Concrete Pavement Base Type III(HES)for <br /> 96 Trench Patch 540 SY 36 $ 19,440.00 <br /> 98 HMA,for Overlay -320 Ton 110 $ (35,200.00) <br /> 99 Planing Bituminous Pavement(2-inch Depth) -2022 SY 5 $ (10,110.00) <br /> 100 Cement Concrete Sidewalk Restoration -290 SY 65 $ (18,850.00) <br /> 103 Force Account -1 FA 39000 $ (39,000.00) <br /> Summary of Schedule B $ (22,234.00) <br /> Summary of Schedules A&B $ 84,394.48 <br />