My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates Inc. 6/23/2021 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2022
>
David Evans and Associates Inc. 6/23/2021 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 3:18:08 PM
Creation date
7/9/2021 3:17:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates Inc.
Approval Date
6/23/2021
Council Approval Date
6/16/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Planning/Design services sewer facilities
Public Works WO Number
UP3734
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0002331
Total Compensation
$330,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
CHS Engineers LLC 5/4/2020
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.Design Development <br /> 6.4.1.Confirm final design criteria for wet well sizing and total dynamic head calc based <br /> on final force main length and profile and final wet well depth and control level <br /> setpoints. <br /> 6.4.2. Coordinate with Snohomish County PUD for new electrical service location and <br /> requirements including development of final electrical load and completion of <br /> application for new service. <br /> 6.5.Submittals and Review Meetings <br /> 6.5.1 .Prepare and submit plans at 60% stage of completion for City review and <br /> comment, for each set of contract documents <br /> 6.5.2.Meet via Zoom' to review 60% plan review comments and remaining design <br /> work, for each set of contract documents <br /> 6.5.3.Prepare and submit plans, special provisions, with construction cost estimate at <br /> 95% stage of completion for City review and comment <br /> 6.5.4.Meet via Zoom to review comments and remaining design work, for each set of <br /> contract documents <br /> 6.5.5.Prepare and submit final "proof' set of plans, special provisions and technical <br /> specifications for City review and comment <br /> 6.5.6.Meet via Zoom to receive and address final City comments, for each set of <br /> contract documents. <br /> 6.5.7.Provide signed and stamped final construction documents, for each set of <br /> contract documents <br /> 7. Plans, Project Manual (Specifications, Proposal and Special Provisions) and <br /> Estimate <br /> 7.1.Lift Station <br /> 7.1.1. Plans (about 19 sheets) <br /> 7.1.1.1. Cover, sheet index and vicinity map, legend, general notes, survey <br /> existing conditions map (4 sheets) <br /> 7.1 .1.2. Site Plans (5 sheets) <br /> 7.1.1.2.1. TESC and site demolition/upgrade for station <br /> 7.1.1.2.2. Site and TESC details <br /> 7.1.1.2.3. Park parking area striping plan and details <br /> 7.1.1.2.4. Bioxide tank site plan <br /> 7.1 .1.3. Mechanical/Structural Plan and Details (5 sheets) <br /> 7.1.1.3.1. Station plan and elevation <br /> 7.1.1.3.2. Shelter plan, section, and details <br /> 7.1.1.3.3. Station detail sheets <br /> 7.1.1.4. Electrical Design and Plans (5 sheets) <br /> 7.1.1.4.1. Electrical Site Plan and Legend <br /> 7.1.1.4.2. Enlarged plan and elevation <br /> 7.1.1.4.3. Wet well plan and elevation and cable splice enclosure <br /> 7.1.1.4.4. One line diagram, conduit, and cable schedule <br /> 7.1.1.4.5. Details <br /> 7.1.2. Project Manual <br /> 7.1.2.1. Proposal and Contract Documents — adapt City standard proposal and <br /> contract documents to the project details including advertisement for bid, <br /> 1 Or similar virtual meeting program, typical. <br /> David Evans and Associates, Inc. Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.