My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates Inc. 6/23/2021 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2022
>
David Evans and Associates Inc. 6/23/2021 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 3:18:08 PM
Creation date
7/9/2021 3:17:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates Inc.
Approval Date
6/23/2021
Council Approval Date
6/16/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Planning/Design services sewer facilities
Public Works WO Number
UP3734
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0002331
Total Compensation
$330,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
CHS Engineers LLC 5/4/2020
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
proposal, bond, contract, general requirements to modify the current edition of <br /> the WSDOT Standard Specifications and measurement and payment <br /> descriptions. Prepare proposal form in spreadsheet format, for use for <br /> construction cost estimate, and bid tabulation by City. <br /> 7.1 .2.2. Special Provisions — adapt City typical special provisions with project <br /> requirements and add special provisions for project requirements including <br /> sections for: <br /> • construction sequencing and bypass plan <br /> • sewer main and manhole <br /> • wet well, valve vault and access hatches <br /> • pump equipment, piping, and valves <br /> • power, control and telemetry equipment including standby <br /> generator <br /> • water service and backflow preventer <br /> • fencing <br /> 7.1.2.3. Appendices — prepare appendices including geotechnical evaluation <br /> report, applicable City standard details, City-provided change order forms, <br /> permits (if any) and applicable WSDOT standard plans. <br /> 7.1.3. Construction Cost Estimate <br /> 7.1.3.1. Prepare engineer's estimate of construction cost based on 95% <br /> completion of plans and specifications. <br /> 7.2.Force Main <br /> 7.2.1. Plans (about 19 sheets) <br /> 7.2.1.1. Cover, sheet index and vicinity map, legend, general notes, survey <br /> existing conditions map (6 sheets) <br /> 7.2.1.2. Site Plans (13 sheets) <br /> 7.2.1.2.1. TESC plans <br /> 7.2.1.2.2. Site and TESC details <br /> 7.2.1.2.3. Plan and profile sheets <br /> 7.2.1.2.4. Details <br /> 7.2.2. Project Manual <br /> 7.2.2.1. Proposal and Contract Documents — adapt City standard proposal and <br /> contract documents to the project details including advertisement for bid, <br /> proposal, bond, contract, general requirements to modify the current edition of <br /> the WSDOT Standard Specifications and measurement and payment <br /> descriptions. Prepare proposal form in spreadsheet format, for use for <br /> construction cost estimate, and bid tabulation by City. <br /> 7.2.2.2. Special Provisions — adapt City typical special provisions with project <br /> requirements and add special provisions for project requirements including <br /> sections for: <br /> • construction sequencing and bypass plan <br /> • force main and saddle manhole <br /> • trench and road restoration <br /> 7.2.2.3. Appendices — prepare appendices including geotechnical evaluation <br /> report, applicable City standard details, City-provided change order forms, <br /> permits (if any) and applicable WSDOT standard plans. <br /> 7.2.3. Construction Cost Estimate <br /> David Evans and Associates, Inc. Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.