My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates Inc. 6/23/2021 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2022
>
David Evans and Associates Inc. 6/23/2021 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 3:18:08 PM
Creation date
7/9/2021 3:17:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates Inc.
Approval Date
6/23/2021
Council Approval Date
6/16/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Planning/Design services sewer facilities
Public Works WO Number
UP3734
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0002331
Total Compensation
$330,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
CHS Engineers LLC 5/4/2020
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.2.3.1. Prepare engineer's estimate of construction cost based on 95% <br /> completion of plans and specifications. <br /> 8. Bidding Support <br /> 8.1.Bidding Support— Lift Station <br /> 8.1.1. Advertisement for Bid — finalize Ad for City Clerk approval and publication and <br /> prepare PDFs of contract documents for posting by City to Builders Exchange of <br /> Washington (BXWA) <br /> 8.1.2. Bidder Inquiries — respond to inquiries, including preparation of one addendum <br /> as warranted, provide PDF to City to post to BXWA for distribution. <br /> 8.1.3. Bid Review— Review of contractor bids and recommendation of award to support <br /> City's evaluation of bids and recommendation of award or other action. <br /> 8.2.Bidding Support— Force Main <br /> 8.2.1. Advertisement for Bid — finalize Ad for City Clerk approval and publication and <br /> prepare PDFs of contract documents for posting by City to Builders Exchange of <br /> Washington (BXWA) <br /> 8.2.2. Bidder Inquiries — respond to inquiries, including preparation of one addendum <br /> as warranted, provide PDF to City to post to BXWA for distribution. <br /> 8.2.3. Bid Review— Review of contractor bids and recommendation of award to support <br /> City's evaluation of bids and recommendation of award or other action. <br /> 9. Construction Support <br /> 9.1.Construction Support - Lift Station <br /> 9.1.1. Preconstruction Conference — attend and lead or support pre-construction <br /> conference at City between City and contractor, including preparation of meeting <br /> summary. <br /> 9.1.2. Shop Drawings and Submittal Review — Review contractor's shop drawing and <br /> construction method submittals for conformance with project documents. Up to <br /> 40 original and re-submittals are anticipated. <br /> 9.1.3. RFI Response —review requests for information from contractor. Coordinate <br /> review with City staff including update of master log, and electrical and controls <br /> sub-consultant. Up to 15 are anticipated. <br /> 9.1.4. Construction Meetings — support 12 bi-weekly construction meetings via Zoom <br /> or similar remote meeting platform between City and contractor and conduct up to <br /> four construction meetings in person at City or project site. <br /> 9.1.5. Limited Construction Observation as requested by City <br /> 9.1.5.1. Civil engineer perform up to four site visits and provide up to 16 hours of <br /> general office consultations for review of specific conditions and general <br /> progress monitoring. Site visits shall be documented by written report, <br /> related sketches, and digital photos. <br /> 9.1 .5.2. Electrical engineer perform up to two site visits and provide up to 8 hours <br /> of general office consultation for review of specific conditions. <br /> 9.1 .5.3. Inspection and consultation (up to two site visits) by HWA GeoSciences <br /> for guidance with respect to geotechnical aspects of the work. <br /> 9.1.6. Changes, Force Account and Change Orders - review miscellaneous work/force <br /> account bid item activities with City as requested. Prepare changes initiated by <br /> the City/Engineer in the form of Engineer's Supplemental Instructions (ESIs) for <br /> no cost changes. Review Change Order Proposals (COPs) from Contractor <br /> whether in response to an RFI/ESI/COP or Contractor initiated. Up to five ESIs <br /> and five COPs are anticipated. <br /> David Evans and Associates, Inc. Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.