Laserfiche WebLink
View Ridge Community Church <br /> Plan Check Number: B1803-040, First Review <br /> May 25, 2018 <br /> 37.The interior lighting power requirements for the building shall comply with WSEC Section <br /> 405.4. Documentations substantiating compliance with these requirements shall be submitted <br /> for review. <br /> Miscellaneous: <br /> 38. Detail D/6-of-9 shows a 2x wood piece being used as a thermal break for the slab and is in- <br /> contact with the soil. A note shall be included requiring the piece to be treated in accordance <br /> with AWPA U1. See IBC Sections 1807.1.4 and 2303.1.9. <br /> Structural <br /> General: <br /> 1. The structural drawings are printed on 36-inch x 48-inch sheets. The maximum sheet size for <br /> submittal drawings to the City of Everett is 30-inch x 42-inch sheets. Revised drawings not <br /> exceeding the maximum size shall be resubmitted. Note that the site plans have been <br /> prepared on 24-inch by 36-inch plans; we recommend resizing the drawings to match these <br /> plans for consistency. See the Commercial Buildings Submittal Checklist available on the City <br /> of Everett website: <br /> https://everettwa.gov/DocumentCenter/View/119/Commercial-Checkl istTenant-Improvement-PDF <br /> Drawings exceeding the maximum size will not be accepted. The text size should be increased <br /> to improve legibility. <br /> 2. The proposed project shall satisfy the provisions of the IEBC. This code shall be referenced in <br /> the"Design Criteria"section on Sheet_S-1. See IBC Sections 101.4.7 and 107.2.1. <br /> 3. The IEBC provides three alternative methods for performing work: the Prescriptive Compliance <br /> Method (Section 301.1.1), the Work Area Method (301.1.2), and the Performance Compliance <br /> Method (301.1.3). The method selected for the project should be specified in the structural <br /> general notes. A statement should be provided clarifying the types of work that are included in <br /> the project (e.g., repairs, additions, change of occupancy, etc.) and referencing the <br /> appropriate IEBC sections. In order to proceed with the review, comments provided herein are <br /> based on the project complying with the Work Area Method of Chapter 5. Based on a review <br /> of the submittal documents, the proposed project appears to include the following work: Level <br /> 2 Alternations (Chapter 8) and Additions (Chapter 11). Additional and alternative types of <br /> work required for the project shall be identified by the designer-of-record. Additional <br /> comments may be pending. See IBC Section 301.1. <br /> 4. Structural and geotechnical special inspections are required for this project. A statement on <br /> special inspections shall be submitted with the permit documents. The statement shall include <br /> a table listing each type of special inspection and shall specify the extent of each inspection <br /> (e.g., continuous, periodic) per IBC Section 1704.3.1. The table shall include special <br /> requirements for seismic and wind resisting systems as required by IBC Sections 1704.3.2 and <br /> 1704.3.3, respectively. See IBC Sections 107.1, 1704.2.3 and 1704.3. <br /> 7of12 <br /> CITY OF EVERETT• 3200 Cedar Street • Everett,WA 98201 • (425) 257-8810 • Fax(425) 257-8857--- <br />