Laserfiche WebLink
View Ridge Community Church <br /> Plan Check Number: B1803-040, First Review <br /> May 25, 2018 <br /> c. The calculations shall substantiate the design of the collectors in Details CS1, CS2, and <br /> STC. <br /> d. The Main Floor diaphragm does not appear to include a collector on Wall Line A per Sheet <br /> S-4. Verify if a collector is required at this location. <br /> 23.The first story in the east-west direction must support soil pressures from the east retaining <br /> wall, including seismic surcharge, in addition to the seismically-induced forces from self-weight <br /> and the addition. Calculations for the increased base shear and the capacity of the lateral <br /> force resisting system should be submitted for review. See IBC Sections 1604.1, 1605.2, and <br /> 1610.1. <br /> 24.The Main Floor diaphragm on Sheet S-4 is connected to an existing concrete frame along Wall <br /> Line 3/A-C using a wood ledger per Detail "FL". The existing diaphragm is also bounded by <br /> concrete walls on the three other sides, resulting in the addition diaphragm anchoring to a <br /> relatively stiff system. The inter-diaphragm connection may induce cross-grain bending in the <br /> ledger. An out-of-plane connection should be provided between the addition and existing <br /> building. See IBC Sections 1613.1, 1613.5.1, and 2306.1, ASCE 7-10 Sections 12.10.1.1 and <br /> 12.12.3, and AWC SDPWS-15 Section 4.1.5.1.1. <br /> 25.The framing in the area north of Wall Line A/3-4 on Sheet S-4 appears intended to be <br /> connected to the existing concrete wall. The addition is anchored to a relatively stiff system <br /> and should be provided with an out-of-plane connection to prevent loss of the vertical load <br /> path. Note that the framing appears to support the structure above per the North Elevation on <br /> Sheet 1-of-9 and should include the weight above in the seismic mass. See IBC Sections <br /> 1613.1, 1613.5.1, and 2306.1, ASCE 7-10 Sections 12.10.1.1 and 12.12.3, and AWC SDPWS-15 <br /> Section 4.1.5.1.1. <br /> 26.The shearwall holdown design is provided in the"Lateral Analysis— Holdown Summary"section <br /> of the structural calculations. The earthquake component of the holdown forces exceeds 20% <br /> of the total uplift. The earthquake component shall be increased per the provisions of ACI <br /> 318-14 Section 17.2.3.4.3. In addition, the holdowns include post-installed anchors and shall <br /> satisfy the provisions of Section 17.2.3.3 post-installed anchors. Revised calculations <br /> substantiating the holdown design should be submitted for review. See IBC Section 1901.2. <br /> 27.The wood shear walls on Wall Lines 2, 4, and D (Sheet S-5) do not appear to include holdowns <br /> at the ends to provide overturning resistance. Holdowns shall be provided connecting the <br /> boundary elements (i.e., studs at the wall ends) across floor framing and to the foundation. <br /> Calculations substantiating the design of the holdowns and boundary elements should be <br /> submitted for review. Details for the interstory holddown connections, including discontinuous <br /> shearwalls supported by framing, should be included in the structural drawings. See IBC <br /> Sections 1604.1, 1604.8.1, 1604.10, 2304.10.6, and 2306.1, and NDS-15 SDPWS Sections 3.4, <br /> 4.1.4, and 4.3.6.4.2. See also IBC Section 1901.2, and ACI 318-14 Sections 17.2.3.4.3 and <br /> 17.2.3.3. <br /> 28. Multiple second-story walls on Wall Line 4 are discontinuous to the foundation and result in a <br /> Type 4 Vertical Structural Irregularity per ASCE 7-10 Table 12.3-2. See the West Elevation on <br /> Sheet 1-of-9. The structural elements supporting the wall ends (i.e., header, jamb, , <br /> Page 11 of 12 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax(425) 257-8857 <br />