Laserfiche WebLink
Figure 1-3.1; Flow Chart for Determining Requirements for New <br />Development <br />Start Here <br />Does .the Site have 350/c <br />or more of existing hard <br />surface coverage? <br />Yes10 See Redevelopment Project <br />Thresholds and the Figure "Flow <br />Chart for Determining <br />Requirements for Redevelopment <br />iV0 <br />Does the Project convert %4 <br />acres or more of vegetation to <br />Does the Project result in lawn or landscaped areas, or <br />5,000 square feet, or NO convert,2.5 acres or more of <br />greater, of new plus native vegetation to pasture? <br />replaced hard surface <br />area? <br />No <br />Yes <br />Yes <br />Does the Project result in 2,000 <br />IF square feet, or;greater, of new plus <br />All Minimum Requirements replaced hard surface area? <br />apply to the new and replaced, <br />hard surfaces and converted Yes NO <br />vegetation areas. <br />Does the Project,,have land <br />Minimum Requirements #1 disturbing activities of 7,000 <br />T <br />h #5 applyto the new es square feet or greater? <br />placed hard surfaces <br />the land disturbed. NO <br />Minimum Requirement #2 <br />applies. <br />�r <br />Flow Chart for Determining Requirements for <br />New Development <br />DEPARTMENT OF Revised March 2019 <br />ECOLOGY Please see httpJ/www.ecy.wa.gov/cop0ght htm! for copyright notice including permissions, <br />State of Washington Ilmitatlon of liability, and disclaimer. <br />20.19:Stormwater.Management.Manual for Western Washington <br />Volume l Chapter 3 - Page 89 <br />