Laserfiche WebLink
I <br /> Table 1 —Land Cover Summary I <br /> C, Lawn* FC— FC— FC— Bypass Bypass C, Bio- Total <br /> (ac) C, Pasture* Impery Non-target Impery Pasture retention** (ac) <br /> (ac) (ac) Impery(ac) (ac) (ac) (ac) <br /> Existing 0.30 - 0.54 0.19 - - - 1.03 <br /> Developed - 0.25 0.28 0.19 0.18 0.12 0.01 1.03 <br /> *Bioretention cell area is excluded from Sub-Basin area. <br /> **Bioretention is represented by"Area at Riser Crest El"in the model. <br /> 4.2 Onsite Stormwater Management(OSM) I <br /> The OSM BMPs are described in Volume Ill, Chapter 12 of the City Manual. Refer to Table 2 for <br /> a summary of each BMP considered for feasibility review. <br /> Table 2—OSM BMP Feasibility Review <br /> BMP Infeasibility Justification <br /> BMP 12.10 Vegetation Protection Areas BMP 12.20 is provided. Impervious areas of the <br /> project area have been reduced. <br /> BMP 12.20 Soil Amendments, Quality, and Depth BMP 12.20 is provided for all proposed <br /> landscaped areas. <br /> BMP 12.30 Onsite Infiltration Areas BMP 12.30 is not feasible because the soil onsite <br /> has no infiltration potential. <br /> BMP 12.40 Raingardens Bioretention cell is provided. <br /> BMP 12.40 Downspout Dispersion Systems Splash blocks area provided to spread roof runoff <br /> over bioretention cell. <br /> BMP 12.50 Concentrated Flow Dispersion BMP 12.50 is not feasible due to site constrains. I <br /> BMP 12.60 Sheet Flow Dispersion BMP 12.60 is provided for all impervious or <br /> pervious surfaces that are graded to avoid <br /> concentrating flows. <br /> The bioretention area provided for meeting OSM is sized per the SMMWW, Volume Ill, <br /> BMP T5.14. The design guidelines recommend that the ponding area be sized as 5 percent of <br /> the total impervious surface area and 2 percent of the total pervious surface area draining to it. <br /> Because of the limited available area, the bioretention cell is upsized to the maximum extent and <br /> then back calculated to an equivalent mitigated impervious area. Refer to Appendix A-3 for area <br /> delineation and Table 3 below for a summary of the provided ponding surface area and the <br /> equivalent impervious area draining to the bioretention cell. <br /> Table 3—OSM Sizing <br /> Provided Ponding Equivalent Mitigated <br /> OSM - Surface Area Impervious Surface Area <br /> (sf) (ac) <br /> Bioretention 564 0.23 <br /> 4.3 Water Quality Treatment <br /> The project site is exempted from Runoff Treatment according to Interim Policy 2-11, as <br /> discussed in Section 2.0. <br /> Stormwater Site Plan Report I <br /> North Sound Behavioral Health Treatment OW <br /> : Q <br /> AHBL No.2170857.10 <br />