Capital Architects Group iq <br /> 2813 Rockefeller Ave. Everett,WA 982010 ph:425.317.8017•fax:425.317.8489 <br /> 2. Continuing with the previous comment,the project appears to include work that will be performed on the <br /> premises of fabricators'shops. Special inspections are required to be performed by the fabricators unless they <br /> are registered and approved to perform work without special inspections. The Structural General Notes on <br /> Sheet 51.1 should be revised to list work being performed by approved fabricators. Work not being performed <br /> by approved fabricators should be added to the list of special inspections. See IBC Sections 1704.2.5, <br /> 1704.2.5.1,and Section 1704.5 Items 1 and 2. <br /> Response: <br /> Mantle Industries has AWS-approved welding procedure specification (WPS),welding procedure <br /> qualification record(PQR)and welder qualification log(WPQ)for both aluminum and steel welds used in <br /> our products.These records can be provided on request.All welds are visually inspected by certified <br /> welders. <br /> 3. The bridge is connected to the existing building with an eccentrically-loaded joint per Detail 3/S3.1. The joint <br /> will induce torsional loads into the supporting beam. Calculations substantiating the resistance of the beam and <br /> other stabilizing framing should be submitted for review. See IBC Sections 1604.1 and 1604.4. <br /> Response: <br /> Refer to supplemental calculations by CG Engineering, dated 05/20/2020, and to revised detail 3/S3.1. <br /> 4. The bridge is connected to the existing building with an isolation joint per Detail 3/S3.1. The joint appears to <br /> provide a minimal gap per Detail E2 of the bridge drawings. Calculations substantiating the minimum required <br /> gap should be submitted for review. See IBC Section 1613.1 and ASCE 7-10 Section 12.12.3. <br /> Response: <br /> from Mantle Industries regarding thermal expansion. Revised Sheet 3—3 Detail E2 <br /> CTE of aluminum is 13.1 µin/in-°F. <br /> Length of the lower chord of the bridge 41'-4"which is 496 inches <br /> Extreme thermal range would be 5°f to 95°f,or a range of 90°f <br /> Calculation: 13.1 *496"*90°f=584,784 pin=0.58"total length change from temperature <br /> minimum to temperature maximum <br /> The bridge is expected to be fabricated at a nominal temperature of 60°f. Therefore, it can be <br /> expected to grow 0.23"from its nominal length at 95°f. The nominal gap at the narrowest point <br /> between the hanging lug and the mount is 0.437". This leaves 0,209"gap at 95°f. This means that the <br /> nominal gap will be decreased by a little more than half when the bridge bottom chord heats to 95°f, <br /> Bridge <br /> 1. Structural special inspections are required for this project. See additional comments above in the"Structural" <br /> section of this letter for additional information. A statement of special inspections should be provided in the <br /> bridge drawings unless they are included in the S-series drawings. Where the inspection requirements are <br /> included in the 5-series drawings,a reference to the requirements should be provided. The bridge EOR should <br /> coordinate with the abutment EOR to verify that the required inspections are listed. See IBC Sections 107.1, <br /> 1704.2.3 and 1704.3. <br /> Response: <br /> See comment on structural#2. <br /> 2. The Elevation on Sheet 2-of-3 specifies a bridge span and angle of 41 feet and 4.7 degrees,resulting in a rise of <br /> approximately 40 inches. The bridge is fundamentally a ramp and limited to a rise of 30 inches between <br /> landings per IBC Section 1012.4. The bridge should be revised to provide an intermediate landing or limit the <br /> rise over its length to 30 inches. Landings should comply with IBC Section 1012.6. <br /> Response: <br /> Resolved May 6,2020 email exchange with City of Everett(Excerpt follows) <br /> Responding to your email of May 4, 2020, we confirm the following direction of action. <br /> The designer-of-record, Capital Architects Group PC,Sandra Higgins, President, has determined that the bridge <br /> falls under the International Existing Building Code,whereby provisions therein,allow the bridge to be- --� <br /> 2 I Pag <br />