My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST 2020 RAINIER HALL Plans 2022-11-28
>
Address Records
>
TOWER ST
>
2000
>
RAINIER HALL
>
Plans
>
2000 TOWER ST 2020 RAINIER HALL Plans 2022-11-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2022 1:19:02 PM
Creation date
8/17/2021 8:50:24 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
RAINIER HALL
Permit
B2001-039
Year
2020
Notes
MODIFY TOILET ROOMS ON FLOORS 1,2,3 AND MAKE TOILET ROOM
Address Document Type
Plans
Imported From Microfiche
No
Link Groups
Link
1:
2000 TOWER ST 2020 RAINIER HALL Plans 2022-11-28
Last modified:
11/28/2022 1:19:02 PM
Path:
\Documents\Public Works\Records\Address Records\TOWER ST\2000\RAINIER HALL\Plans
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3RD FLOOR RESTROOMS D-EMOLITION POWER PLAN_ <br />SCALE: 1 /4" = l'—O" <br />DEMOLITION3RD FLOOR RESTROOMS P <br />LAN <br />GENERAL NOTES <br />1. CIRCUIT NUMBERS SHOWN REFER TO PANEL E UNLESS OTHERWISE NOTED. <br />FLAG TES <br />1 PROVIDE LABOR AND MATERIALS AS REQUIRED TO EXTEND EXISTING BRANCH CIRCUIT IN CEILING <br />SPACE TO NEW LOCATION SHOWN. SEE FLAG NOTE 1, SHEET ED2.3, FOR ADDITIONAL INFORMATION. <br />GENERAL NOTES <br />1. CIRCUIT NUMBERS SHOWN REFER TO PANEL L1 UNLESS OTHERWISE NOTED. <br />GENERAL NOTES <br />1. FIRE ALARM SYSTEM IS BIDDER DESIGNED. PROVIDE LABOR AND MATERIALS AS REQUIRED TO <br />REUSE EXISTING FIRE ALARM PANEL AND CONNECT TO NEW DEVICE. EXISTING FIRE ALARM PANEL <br />TO BE VERIFIED IF IN —USE BY CONTRACTOR, IF NOT IN USE, DEMOLISH AND PROVIDE COMPLETE <br />NEW SYSTEM APPROVED BY THE AHJ. <br />2. SUBMIT COMPLETED DRAWINGS AND CALCULATIONS TO AUTHORITY HAVING JURISDICTION <br />FOR APPROVAL. COMPLY WITH AND PROVIDE ALL REQUIREMENTS. <br />3. SUBMIT APPROVED DRAWINGS AND CALCULATIONS TO OWNER FOR REVIEW PRIOR TO PURCHASE OF <br />EQUIPMENT OR ROUGH IN. <br />4. COORDINATE ALL DEVICE LOCATIONS WITH ARCHITECTURAL INTERIOR ELEVATIONS AND CEILING <br />PLANS PRIOR TO ROUGH --IN. <br />5. SHOULD ANY DEVICE LOCATION FALL WITHIN A MIRROR OR OTHER ARCHITECTURAL <br />FEATURE, COORDINATE LOCATION WITH ARCHITECT PRIOR TO ROUGH IN. <br />6. FIELD VERIFY EXISTING CONDITIONS PRIOR TO BID. <br />!. PROVIDE FIRE WATCH AS REQUIRED BY THE AHJ AND NFPA. <br />S. DEVICE LOCATIONS ARE SHOWN FOR REFERENCE ONLY AND DO NOT REFLECT EXACT <br />REQUIREMENTS FOR A FULLY FUNCTIONAL FIRE ALARM SYSTEM AHJ APPROVED DESIGN. <br />9. SEE SPECIFICATIONS SECTION FOR ADDITIONAL INFORMATION. <br />copyright 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.