My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST 2020 RAINIER HALL Plans 2022-11-28
>
Address Records
>
TOWER ST
>
2000
>
RAINIER HALL
>
Plans
>
2000 TOWER ST 2020 RAINIER HALL Plans 2022-11-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2022 1:19:02 PM
Creation date
8/17/2021 8:50:24 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
RAINIER HALL
Permit
B2001-039
Year
2020
Notes
MODIFY TOILET ROOMS ON FLOORS 1,2,3 AND MAKE TOILET ROOM
Address Document Type
Plans
Imported From Microfiche
No
Link Groups
Link
1:
2000 TOWER ST 2020 RAINIER HALL Plans 2022-11-28
Last modified:
11/28/2022 1:19:02 PM
Path:
\Documents\Public Works\Records\Address Records\TOWER ST\2000\RAINIER HALL\Plans
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 ltlUT CVA/ITPU AAlf1 - 1 IMIT CUIITOU AAIf1 <br />2ND FLOOR RES <br />SCALE: 1 /4" = 1,-08> <br />0 <br />0 <br />6 f <br />TROOMS DEMOLITION POWER PLAN <br />2ND FLOOR RESTROOMS DEMOLITION LIGHTING PLAN <br />SCALE. 1 /4" = 1'v-0" <br />GENERAL NOTES <br />1. CIRCUIT NUMBERS SHOWN REFER TO PANEL D UNLESS OTHERWISE NOTED. <br />FLAG NOTES <br />1 PROVIDE LABOR AND MATERIALS AS REQUIRED TO EXTEND EXISTING BRANCH CIRCUIT IN CEILING <br />SPACE TO NEW LOCATION SHOWN. SEE FLAG NOTE 1, SHEET ED2.2, FOR ADDITIONAL INFORMATION, <br />GENERAL NOTES <br />1. CIRCUIT NUMBERS SHOWN REFER TO PANEL L UNLESS OTHERWISE NOTED. <br />GENERAL NOTES <br />1. FIRE ALARM SYSTEM IS BIDDER DESIGNED. PROVIDE LABOR AND MATERIALS AS REQUIRED TO <br />RE -USE EXISTING FIRE ALARM PANEL AND CONNECT TO NEW DEVICE. EXISTING FIRE ALARM PANEL <br />TO BE VERIFIED IF IN -USE BY CONTRACTOR. IF NOT IN USE, DEMOLISH AND PROVIDE COMPLETE <br />NEW SYSTEM APPROVED BY THE AHJ. <br />2. SUBMIT COMPLETED DRAWINGS AND CALCULATIONS TO AUTHORITY HAVING JURISDICTION <br />FOR APPROVAL. COMPLY WITH AND PROVIDE ALL REQUIREMENTS, <br />3. SUBMIT APPROVED DRAWINGS AND CALCULATIONS TO OWNER FOR REVIEW PRIOR TO PURCHASE OF <br />EQUIPMENT OR ROUGH IN. <br />4. COORDINATE ALL DEVICE LOCATIONS WITH ARCHITECTURAL INTERIOR ELEVATIONS AND CEILING <br />PLANS PRIOR TO ROUGH -IN. <br />5. SHOULD ANY DEVICE LOCATION FAIL WITHIN A MIRROR OR OTHER ARCHITECTURAL <br />FEATURE, COORDINATE LOCATION WITH ARCHITECT PRIOR TO ROUGH IN. <br />6. FIELD VERIFY EXISTING CONDITIONS PRIOR TO BID. <br />/. PROVIDE FIRE WATCH AS REQUIRED BY THE AHJ AND NFPA, <br />B. DEVICE LOCATIONS ARE SHOWN FOR REFERENCE_ ONLY AND DO NOT REFLECT EXACT <br />REQUIREMENTS FOR A FULLY FUNCTIONAL FIRE ALARM SYSTEM AHJ APPROVED DESIGN, <br />9. SEE SPECIFICATIONS SECTION FOR ADDITIONAL INFORMATION. <br />C7copyright 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.