My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1920 100TH ST SE 2021-12-13
>
Address Records
>
100TH ST SE
>
1920
>
1920 100TH ST SE 2021-12-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 8:41:51 AM
Creation date
9/16/2021 9:12:15 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SE
Street Number
1920
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A& <br />r1 <br />Lighting, Motor, and bectrical Permit Checklist, PQ,.'2 LTG-CHK <br />2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all R1 Revised July 2016 <br />Project Title: SEA MAR EVERETT MEDICAL CLINIC <br />Date 6/18/2019 <br />The following information is necessary to check a permit application for compliance with the lighting, motor, and electrical requirements in the <br />Washington State Energy Code, Commercial Provisions. <br />Applicability <br />Location in <br />Building Department <br />(yes,no,na) <br />Code Section <br />Component <br />Compliance information required in permit documents <br />Documents <br />Notes <br />C405.2.5 - <br />Hotel/motel guest <br />Indicate method of automatic control - vacancy or captive key <br />NA <br />Item 3 <br />rooms <br />control of all installed luminaires and switched receptacles in <br />guest room <br />C405.2.5 - <br />Supplemental task <br />Indicate method and location of automatic shut-off vacancy <br />No <br />Item 4 <br />lighting <br />control for supplemental task lighting, including under -shelf or <br />under -cabinet lighting <br />Indicate on plans eligible non -visual lighting applications, <br />include sq. ft. area of each lighting control zone; <br />Indicate on plans that non -visual lighting are controlled <br />C405.2.5 - <br />Lighting for non- <br />No <br />Item 5 <br />visual applications <br />independently from both general area lighting and other lighting <br />applications within the same space; <br />Indicate method of manual lighting control and applicable <br />automatic lighting control <br />Indicate on plans that lighting equipment for sale or <br />demonstration are controlled independently from both general <br />C405.2.5 - <br />Lighting equipment <br />area lighting and other lighting applications within the same <br />NA <br />Item 6 <br />for sale or <br />space; <br />demonstration <br />Indicate method of manual lighting control and applicable <br />automatic lighting control <br />Identify on plans egress fixtures that function as both normal <br />A0.01 <br />and emergency means of egress illumination; <br />Provide calculation of lighting power density of total egress <br />YES <br />C405.2.5 - <br />Means of egress <br />lighting; <br />If total egress lighting power density is greater than 0.02 W/sq. <br />Item 7 <br />lighting <br />ft., indicate on plans egress fixtures requiring automatic shut-off <br />during unoccupied periods; <br />Indicate method of automatic shut-off control <br />Indicate on exterior lighting plans and fixture schedules the <br />automatic lighting control method, control sequence, and <br />locations served; <br />For building facade and landscape lighting, indicate automatic <br />Exterior lighting <br />controls shut off lighting as a function of dawn/dusk and fixed <br />No <br />C405.2.7 <br />controls <br />opening/closing time; <br />--- -- — <br />For all other exierior lighting, indicate automatic controls shut off <br />---- <br />lighting as a function of available daylight; include control <br />sequence that also reduces lighting power by at least 30% <br />between 12am-6am, or from 1 hour after closing to 1 hour <br />before opening, or based upon motion sensor <br />Exterior building <br />For building grounds fixtures greater than 100 watts, indicate on <br />No <br />C405.5.1 <br />grounds lighting <br />plans whether fixtures have efficacy greater than 80 lumens or; <br />controls <br />are controlled by motion sensor, or are exempt lighting per <br />C405.5.2 <br />Area controls - <br />Indicate location(s) of master control switch(es) intended to <br />Master control <br />control multiple independent switches; circuit breaker may not <br />No <br />C405.2.5 <br />switches and circuit <br />be used as a master control switch; <br />- ---- <br />Verify that no 20 amp circuit controlled by a single switch or <br />power limit <br />automatic control is loaded beyond 80% <br />To comply with additional efficiency package option, indicate on <br />plans all interior lighting fixtures that are individually addressed <br />and provided with continuous dimming, or exception taken; <br />No <br />C406.4 <br />Enhanced digital <br />Include calculation of percent total installed interior lighting <br />lighting controls <br />power that is configured with required enhanced lighting control <br />functions (min 90% to comply with additional efficiency package <br />option) <br />If claiming lighting system commissioning exemption provide <br />supporting calculation; <br />Identify applicable commissioning documentation requirements <br />C405.13 <br />Lighting system <br />C408.3 <br />functional testing <br />per Section C408 or eligibility for exception; <br />Provide written procedures for functional testing of all automatic <br />controls and describe the expected system response <br />
The URL can be used to link to this page
Your browser does not support the video tag.