Laserfiche WebLink
Kevin and Stacey Cole <br />6815 Colby Avenue <br />Plan Check Number: B2005-038, First Building Review <br />July 1, 2020 <br />Roof: <br />9. The requirements for the roof construction do not appear to be specified. See IRC Section <br />106.1.1. The following comments should be addressed: <br />a. The roof sheathing should be specified, including the grade, orientation, layout (e.g., <br />staggered), and blocking requirements. See IRC Section R803.2. <br />b. Section 1/A304 does not provide a continuous lateral load path between the roof and wall <br />sheathing for the north and south walls. The design should be revised. See IRC Section <br />R602.10.8.2 and Figure 602.10.8.2. <br />10. Section 1/A303 specifies a metal strap at each end of the pre-engineered trusses. The make <br />and model of the straps should be specified. The strap should comply with the design loads of <br />Sections 106.1.1 and IRC R802.11.1.1. <br />This review has been performed for general compliance with the building codes as adopted and <br />amended by the state of Washington and the city of Everett. Corrections and comments made <br />during the review process do not relieve the project from compliance with code and permit <br />requirements. The designers -of -record are responsible for a complete design in accordance with <br />the laws of the state of Washington. <br />If you have any questions or require additional clarification, please contact us. <br />Respectfully, <br />Drew Martin, P.E., S.E. <br />Associate Engineer / Commercial Plans Examiner <br />(425)257-8813 <br />dmartin@everettwa.gov <br />O3200 Cedar Street 425.257.8810 O everetteps@everettwa.gov <br />Everett, WA 98201 425.257.8857 fax everettwa.gov/permits <br />Page 4 of 4 <br />