Laserfiche WebLink
0 <br />EVERETT <br />WASHINGTON <br />May 20, 2019 <br />CITY OF EVERETT <br />Permit Services <br />Mr. Markus Barrera-Kolb <br />Environmental Works <br />402 15th Avenue East <br />Seattle, WA 98112 <br />Email Address: mbarrera-kolb@eworks.org <br />RE: Owner: Childstrive <br />Job Address: 14 E Casino Road, Building C <br />Plan Check Number: B1903-001, Second Building Review <br />Dear Mr. Barrera-Kolb, <br />We have reviewed the responses to the First.Review letter dated May 15, 2019. Multiple comments <br />have not been completely addressed and require additional action before a permit can be issued. <br />Additional comments have been added based on a review of the revised construction drawings. <br />These comments address building issues only. The comments are itemized for consistency with the <br />original review letter. Additional revisions or additions may be required by other departments <br />including Public Works, Planning, and Fire. <br />Code citations provided in the following comments reference the 2015 International Building Code <br />(IBC), the 2015 International Existing Building Code (IEBC), the 2015 International Property <br />Maintenance Code (IPMC), the 2015 International Fire Code (IFC), the 2015 International <br />Mechanical Code (IMC), and the 2015 International Energy Conservation (IECC), and the 2015 <br />Washington State Energy Code (WSEC). The current IBC referenced standard for accessible design <br />is the 2009 "Accessible and Usable Buildings and Facilities" (ICC/ANSI A117.1). Federal ADA, FHA, <br />and HUD regulations and standards, including the Fair Housing Accessibility Guidelines, may be <br />more restrictive. References to other design standards include the current edition. <br />In order for the processing of your application to continue, the following documentation should be <br />submitted to the Building Division for review: <br />a. Itemized letter addressing the comments provided below. <br />b. Two complete sets of revised construction drawings. <br />Submittal documents shall contain sufficient information and detail to review the proposed project <br />for compliance with the adopted codes. Upon submittal of the revised documents, your application <br />will be given priority and plan reviews will recommence. <br />age:1(7of 4 <br />