Laserfiche WebLink
0 <br />• <br />STEP 2. PROVIDE BASIC PROJECT INFORMATION <br />Project type: ❑ Single Family Residence (SFR) ❑ Townhome <br />0 ❑ Duplex ❑ Multi -Family 0 Commercial <br />❑ Industrial ❑ Accesory Dwelling Unit (ADU) <br />Select if your project is: ❑ New development 0 Redevelopment <br />Please quantify the project scope. <br />See glossary for definitions (e.g. hard surface, impervious, pervious, etc.) <br />Total lot size/project area <br />2,145,765 <br />ft2 <br />Total proposed area to be disturbed: <br />(project boundaries) We do not anticipate that the propos <br />will result in disturbed area. <br />0 ft2 <br />xd portable installation <br />Total disturbed pervious area: <br />(includes existing gravel) We do not anticipate that the propos <br />will result in disturbed area. <br />0 ft2 <br />d portable installation <br />Converted pervious surface area: <br />(native vegetation to lawn or landscape) <br />0 <br />ft2 <br />Proposed <br />new hard <br />surface area <br />(A+B=C): <br />A - Proposed new roof area: <br />3,910 ft2 <br />B - Proposed new other hard surface area on ground: <br />0 ft2 <br />C - Total proposed new hard surface area: <br />3,910 ft2 <br />Proposed <br />replaced hard <br />surface area <br />(D+E=F): <br />D - Proposed replaced roof area: <br />0 <br />ft2 <br />E - Proposed replaced other hard surface area on ground: <br />f1 <br />ft2 <br />F - Total proposed replaced hard surface area: <br />0 <br />ft2 <br />Proposed <br />new and <br />replaced hard <br />surface area <br />(C+F=I): <br />G - Proposed new plus replaced roof area (A+D): <br />0 <br />ft2 <br />H - Proposed new plus replaced other hard surface area on ground (B+E): <br />0 <br />fill <br />I - Total proposed new and replaced hard surface area: <br />3,910 <br />ft2 <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 3 <br />