My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1025 NORTH PARK DR 2021-11-15
>
Address Records
>
NORTH PARK DR
>
1025
>
1025 NORTH PARK DR 2021-11-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 1:20:25 PM
Creation date
11/15/2021 1:19:47 PM
Metadata
Fields
Template:
Address Document
Street Name
NORTH PARK DR
Street Number
1025
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Corrective Action, Deadline <br /> If the Respondent completes the following corrective action by the date listed below, <br /> and is not a repeat violator, the respondent may enter into an agreed order as <br /> described in Section 7 below. <br /> 1. Apply for and obtain the City of Everett Public Works permits and Building <br /> Department permits required to bring the property into code compliance with the <br /> Everett Municipal Code, International Residential Code and the International <br /> Property Maintenance Code. <br /> 2. Provide property construction drawings for the conversion of the property carport I <br /> into a garage and the property addition of a laundry room and the additional <br /> bathroom. <br /> 3. Provide property construction drawings for the property addition of a deck in <br /> front of the house structure family room. <br /> 4. Using the City of Everett Public Works Department permit application process, . <br /> add the separate free standing deck to the property site plan as required to be <br /> reviewed, approved and inspected. <br /> 5. The completed permitted alterations work at the property is required by the City <br /> of Everett Public Works permits and Building Department permits to have the <br /> work inspected, approved and finaled by staff from the City of Everett, Public <br /> Works Department and Building Department. . <br /> The corrective action must be completed before April 12, 2019. <br /> 6. Hearing Date, Time & Location <br /> Unless you, the Respondent, have entered into a stipulated agreement in accordance <br /> with Section 7 (below), a hearing before the Violations Hearing Examiner will be held <br /> on: <br /> HEARING DATE: Thursday, April 25, 2019 at 1:00 pm. I <br /> LOCATION: City of Everett Violations Hearing Room I <br /> Wall Street Building, Suite #8-C I <br /> 2930 Wetmore Avenue <br /> Everett, Washington 98201 1 <br /> Everett Police Department,Code Enforcement Unit•3002 Wetmore Ave•Everett,WA 98201 •425-257-8560 3/ fl I <br />
The URL can be used to link to this page
Your browser does not support the video tag.