My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 11/2/2021 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2022
>
WA ST Dept of Ecology 11/2/2021 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2021 9:55:20 AM
Creation date
11/19/2021 9:55:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
11/2/2021
Council Approval Date
10/21/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
Sam Alexander
Subject / Project Title
Port Gardner Bay Outfalls Water Quality
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0001877
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant
Retention Period
6 Years Then Destroy
Document Relationships
Washington State Department of Ecology 5/5/2019
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of Washington Department of Ecology Page 4 of 11 <br /> • <br /> City of Everett <br /> Port Gardner Bay Outfalls Water Quality Treatment Retrofit Project <br /> Agreement No,WQC-2019-EverPW-00052 <br /> The RECIPIENT will submit one digital copy of the items listed below to ECOLOGY for review. Reduce design figures to <br /> 11 x17 inches in size and ensure they are legible, <br /> 1. Design Report. For a complete list of required design report elements refer to the ECOLOGY website. <br /> The RECIPIENT agrees to respond to ECOLOGY comments.The RECIPIENT must receive an Ecology Design Report <br /> Acceptance Letter prior to proceeding to 90 Percent design. <br /> 2. 90 Percent Design Package. At a minimum,this package must include 90 percent plans,specifications, engineer's opinion <br /> of cost which includes a schedule of eligible costs,and project construction schedule. For current bid inserts and specifications <br /> refer to the ECOLOGY website. <br /> The RECIPIENT agrees to respond to ECOLOGY comments.The RECIPIENT must receive an Ecology 90 Percent Design <br /> Acceptance Letter prior to proceeding Final Design. <br /> 3. The RECIPIENT will submit a digital copy of the Final Bid Package to ECOLOGY for review and acceptance prior to <br /> advertising the project.The Final Bid Package includes:project plans,specifications,engineer's opinion of cost including a <br /> schedule of eligible costs,and project construction schedule. <br /> Task Goal Statement: <br /> The RECIPIENT will complete all design,environmental review,and permitting tasks and respond to ECOLOGY comments in <br /> a timely manner. <br /> Task Expected Outcome: <br /> The project will meet the requirements set forth by the State Environmental Policy Act,cultural resource protection <br /> requirements,ECOLOGY water quality facility design standards,and all other applicable federal,state,and local laws and <br /> regulations. <br /> Deliverables <br /> Number Description Due Date <br /> 2.1 Copy of SEPA determination documentation.Upload to EAGL and <br /> notify Ecology when upload is complete. <br /> 2.2 Submit ECOLOGY 05-05/106 Form and any supplemental cultural <br /> resources documentation including Cultural Resource surveys directly to <br /> the Ecology Project Manager. Upload the Final Determination Letter to <br /> EAGL. <br /> 2.3 Inadvertent Discovery Plan. Upload to EAGL and notify Ecology when <br /> upload is complete. <br /> - 1 <br /> Template Version 10/30/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.