Laserfiche WebLink
State of Washington Department of Ecology Page 6 of 11 <br /> City of Everett <br /> Port Gardner Bay Outfalls Water Quality Treatment Retrofit Project <br /> Agreement No.WQC-2019-EverPW-00052 <br /> E. Prior to execution,the RECIPIENT will submit hi writing any eligible change orders that are a significant deviation from <br /> ECOLOGY-accepted plans and specifications for ECOLOGY review and acceptance for payment.ECOLOGY must review <br /> and accept all change orders that impact grant eligible activities prior to implementation. ECOLOGY must review all other <br /> change orders for technical merit and should be submitted within 30 days after execution.Change orders are to be signed by <br /> the contractor,the engineer(if appropriate),and the RECIPIENT prior to submittal to ECOLOGY for acceptance. <br /> F. The RECIPIENT will operate and maintain the constructed facility for the design life of the facility.Additionally,the <br /> RECIPIENT will develop and submit an operations and maintenance(O&M)plan for all Water Quality Best Management <br /> Practices to ECOLOGY for review.The O&M plan will describe how the RECIPIENT will ensure project success consistent <br /> with the design manual used.The O&M plan must also address long-term activities to assure ongoing pollutant removal and <br /> flow-control capability of the project in accordance with the design manual. <br /> G. Upon completion of construction,the RECIPIENT will provide to ECOLOGY: <br /> I. A Stormwater Construction Completion Form signed by a professional engineer indicating that the project was completed <br /> in accordance with the plans and specifications and major change orders approved by ECOLOGY's Project Engineer and <br /> shown on the Record Drawings.The Stormwater Construction Completion Form can be found on the ECOLOGY website. <br /> 2. GIS compatible project area in Shapefile,Geodatabase file,or ECOLOGY-Approved Equivalent.The project area should <br /> include features for treatment facilities and contributing areas. <br /> Task Goal Statement: <br /> The RECIPIENT will oversee and manage construction,communicate with ECOLOGY in a timely fashion,and provide <br /> ECOLOGY with all requested project documentation. <br /> Task Expected Outcome: <br /> Project will be constructed on schedule and in accordance with accepted plans. <br /> Deliverables <br /> Number Description Due Date <br /> 3.1 Construction Quality Assurance Plan.Submit to ECOLOGY for review <br /> and acceptance. Upload to EAGL and notify ECOLOGY when upload <br /> is complete. <br /> 3.2 Pre-construction conference meeting minutes. Upload to EAGL and <br /> notify Ecology when upload is complete. <br /> 3.3 Project Schedule. Upload to EAGL using naming convention D3.3 <br /> SCHEDULE MO-DA-YEAR and notify Ecology when upload is <br /> complete. <br /> Template Version 10/30/2015 <br />