My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Reservoir 3 Structural Improvements PDB Project <br /> Progressive Design-Build Contract I Exhibit C. Phase 1 Scope of Services <br /> c. Demolition concepts and plans for managing debris <br /> d. Structural design calculations for all structural repairs and affected <br /> components <br /> e. Corrosion control design elements <br /> f. Coordination with geotechnical exploration results, if applicable <br /> g. Vendor supporting information for materials <br /> 3. Reservoir 3 ventilation design, including: <br /> a. Design criteria for ventilation system <br /> b. Design calculations for ventilation system sizing <br /> c. Layout of proposed ventilation system <br /> d. Vendor supporting information for equipment and materials <br /> 4. Valve vault improvements, including: <br /> a. Design criteria for valve vault improvements <br /> b. Design calculations for vault platform <br /> c. Vendor supporting information for equipment and materials <br /> 5. Reservoir 3 cover seismic upgrades (to the extent included in Project) <br /> a. Design criteria for seismic upgrades <br /> b. Calculations for seismic design <br /> c. Locations, materials, and methods for improvements <br /> d. Vendor supporting information for materials <br /> 6. Design planning for protection and repair of existing infrastructure during <br /> construction <br /> 7. Design planning for constructability of improvements <br /> 8. Summary of status of any applicable permits <br /> 9. Updated Phase 2 cost model based on 60 percent design <br /> 10. Updated Phase 2 schedule based on 60 percent design <br /> 11. Preliminary Design and Construction Phasing Plan, including plans for procurement <br /> of any long-lead items, and any suggested early works packages. <br /> 12. Updated Project Risk Register <br /> 13. Preliminary Self-Performance and Subcontracting Plan, identifying work packages <br /> planned to be self-performed and subcontracted, the value of each package, whether <br /> those packages are being procured competitively or sole sourced, description of <br /> approach to procurement for competitive packages, and identity of subcontractor for <br /> sole sourced packages. Plan shall identify plans for local and WMBE outreach and <br /> subcontracting. <br /> 14. All QA/QC Review documentation, including signature pages documenting <br /> completed reviews, and if requested by the City, reviewer comments and design <br /> team responses. <br /> 15. Plans and specifications consistent with a 60 percent design milestone, including at a <br /> minimum the items identified in Table 1. <br /> Table 1. 60% Drawings and Specifications—Minimum Requirements <br /> Page 8 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.