My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Reservoir 3 Structural Improvements PDB Project <br /> Progressive Design-Build Contract I Exhibit C.Phase 1 Scope of Services <br /> Drawings Specifications <br /> General Requirements <br /> Cover Sheet <br /> List of Drawings (May be combined with <br /> Cover Sheet) <br /> List of Abbreviations (May be combined with <br /> Cover Sheet) <br /> General <br /> General legends and abbreviations Preliminary general specifications (all <br /> sections) <br /> General Project Plan(s) <br /> • Based on record drawings —show <br /> existing utilities and structures. <br /> • Locate contractor staging areas and <br /> access routes. <br /> • Identify construction fencing and other <br /> access control measures, including plans <br /> for preserving City operations access. <br /> Construction Staging Plan and Sequencing <br /> Plan <br /> • Show construction staging and storage <br /> areas and expected construction access <br /> Civil <br /> Civil demolition drawings Preliminary civil specifications (all sections) <br /> Valve Vault plan and section <br /> Preliminary pipe, valve, and manhole details <br /> Mechanical <br /> Mechanical demolition drawings (if Preliminary mechanical specifications (all <br /> applicable) sections) <br /> Ventilation system layout and plans <br /> Preliminary ventilation system details <br /> Structural <br /> Structural legends and abbreviations Preliminary structural specifications (all <br /> including updated final drawing list sections), including corrosion protection <br /> Structural demolition drawings <br /> Structural repair plans, sections, and details <br /> Geotechnical plans and details (if applicable) <br /> Seismic plans, sections, and details <br /> The Design-Builder shall submit three (3) paper copies of the draft 60 Percent Design <br /> Documents and one electronic copy in Adobe PDF and MS Word format. <br /> Deliverables: <br /> 1. 60 Percent Design Package <br /> Subtask 4.3 - 90 Percent Design <br /> Page 9 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.