My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington i Reservoir 3 Structural Improvements PDB Project <br /> Progressive Design-Build Contract I Exhibit C. Phase 1 Scope of Services <br /> Design-Builder shall develop and submit a draft 90 Percent Design Submittal to the City for <br /> review and comment. The 90 Percent Design Submittal shall include all documents, drawings <br /> and specifications required under this task. At a minimum, the 90 Percent Design Submittal <br /> shall include: <br /> 1. Narrative description of revisions to the design and construction concepts since the <br /> 60 percent design, including any revisions to design criteria, and rationale for <br /> changes <br /> 2. Summary of status of any applicable permits <br /> 3. Updated Phase 2 schedule based on 90 percent design <br /> 4. Updated Design and Construction Phasing Plan, including plans for procurement of <br /> any long-lead items. Include a brief narrative describing changes to the Plan (if any) <br /> from the 60 percent submittal. <br /> 5. All QA/QC Review documentation, including signature pages documenting <br /> completed reviews, and if requested by the City, reviewer comments and design <br /> team responses. <br /> 6. Plans and specifications consistent with a 90 percent design milestone, including at a <br /> minimum the items identified in Table 2. <br /> Table 2. 90% Drawings and Specifications—Minimum Requirements <br /> Drawings _ Specifications <br /> All drawings included in 60 percent submittal, All specifications included in 60 percent <br /> and any additional drawings identified by the submittal, and any additional specifications <br /> Design-Builder, advanced to 90 percent identified by the Design-Builder, advanced to <br /> completion. 90 percent completion. <br /> The Design-Builder shall submit three (3) paper copies of the draft 90 Percent Design <br /> Documents and one electronic copy in Adobe PDF and MS Word format. <br /> Deliverables: <br /> 1. Draft 90 Percent Design Package <br /> Subtask 4.4- Final Design <br /> Design-Builder shall develop and submit a Final Design Submittal to the City. The Final Design <br /> Submittal shall include all documents, drawings and specifications required under this task, <br /> each stamped and signed by the responsible engineer. At a minimum, the Final Design <br /> Submittal shall include: <br /> 1. Narrative description of revisions to the design package since the 90 percent design, <br /> and rationale for changes <br /> 2. Summary of status of any applicable permits <br /> Page 10 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.