My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7401 LARIMER RD 2021-12-21
>
Address Records
>
LARIMER RD
>
7401
>
7401 LARIMER RD 2021-12-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 11:53:15 AM
Creation date
12/17/2021 11:51:12 AM
Metadata
Fields
Template:
Address Document
Street Name
LARIMER RD
Street Number
7401
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> April 10, 2020 <br /> Page 6 <br /> Plant Survival <br /> During the first late summer monitoring event, plant survival will be evaluated within each of the <br /> sampling transect locations. Percent survival of shrubs and trees will be evaluated in the 10-foot belt <br /> along the established buffer.The species and locations of shrubs and trees within this belt will be <br /> recorded.The established vegetation sampling transects will aid in determining the success of plant <br /> establishment. Monitoring and calculations to determine percent survival will occur only in Years 1 <br /> and 2 unless survival success standards are not met. This is deemed adequate because plants that <br /> survive two summers are considered established. <br /> Monitoring Schedule <br /> Monitoring events will be conducted per the schedule presented in Table 1. <br /> Table 1 <br /> Projected Calendar for Performance Monitoring and Maintenance Events <br /> Report Due to <br /> Year Date Maintenance Review Performance Monitoring Agencies <br /> Immediately after <br /> 0(BA) X X X <br /> construction is complete <br /> Spring X X <br /> 1 <br /> Fall X X X <br /> Spring X <br /> 2 <br /> Fall X X X <br /> Spring X <br /> 3 <br /> Fall <br /> Spring X <br /> 4 <br /> Fall <br /> Spring X <br /> 5 <br /> Fall X X X* <br /> Notes: <br /> *Obtain final approval from the City of Everett (presumes that performance criteria are met). <br /> BA:baseline <br /> Maintenance Actions <br /> Maintenance will be performed at least annually throughout the performance period to address <br /> conditions that could jeopardize the success of the Project. Maintenance visits will entail a walkthrough <br /> of the site to see if any flood events have caused significant erosion or major loss of plants, erosion, or <br /> slope failures.Vegetation sampling will not occur during these maintenance visits. During regular <br /> maintenance visits (per the schedule shown in Table 1), any necessary maintenance actions will be <br /> identified and reported to USACE and the City of Everett along with a corrective action plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.